{"conditions":[{"affectedRowIds":["bathroom-accessory-install-labor","bathroom-tile-edge-trim-install-labor","bathroom-tile-grout-install-labor","bathroom-tile-install-labor","demo-fixture-bath","demo-floor-tile","demo-tile-wall","drywall-patch-repair-labor","exhaust-fan-install-labor","final-punch-walk-labor","fixture-set-per-fixture","floor-transition-install-labor","gfci-afci-device-install-labor","interior-paint-apply-labor","light-fixture-install-labor","outlet-switch-install-labor","paint-prep-labor","plumbing-stub-out-refresh-labor","shower-tub-valve-set","shutoff-valve-install-labor","site-protection-room-labor","trim-baseboard-casing-install","trim-paint-apply-labor","uncoupling-membrane-labor","vanity-install-labor","vanity-mirror-install-labor","vanity-wall-patch-labor"],"baselineFactor":1,"factor":0.93,"id":"occupancy_partial","name":"Partial occupancy","notAdditive":true,"operation":"multiply","resultCents":677244},{"affectedRowIds":["bathroom-accessory-install-labor","bathroom-tile-edge-trim-install-labor","bathroom-tile-grout-install-labor","bathroom-tile-install-labor","demo-fixture-bath","demo-floor-tile","demo-tile-wall","drywall-patch-repair-labor","exhaust-fan-install-labor","final-punch-walk-labor","fixture-set-per-fixture","floor-transition-install-labor","gfci-afci-device-install-labor","interior-paint-apply-labor","light-fixture-install-labor","outlet-switch-install-labor","paint-prep-labor","plumbing-stub-out-refresh-labor","shower-tub-valve-set","shutoff-valve-install-labor","site-protection-room-labor","trim-baseboard-casing-install","trim-paint-apply-labor","uncoupling-membrane-labor","vanity-install-labor","vanity-mirror-install-labor","vanity-wall-patch-labor"],"baselineFactor":1,"factor":0.78,"id":"occupancy_vacant","name":"Vacant property","notAdditive":true,"operation":"multiply","resultCents":568011}],"costTypeSubtotals":{"Allowances":453698,"Dump fees":22500,"Labor":728219,"Materials":83191,"Subcontract":98230},"currency":"USD","date":"2026-11-02","directCostCents":1385838,"explicitStates":{"completenessState":"PROPOSED: frozen build has 62 stored lines and no separately assessed tax, permit or contingency.","contingencyTreatment":"PROPOSED: excluded, not assessed.","markupBase":"Direct job cost.","taxTreatment":"PROPOSED: excluded, not assessed; Clamp's estimate can add tax paid on materials to job cost or charge it to the customer after markup, and neither is in these rows."},"exporterVersion":"3","id":"bath-5x8/v5","labor":{"coverage":"PROPOSED: labor rows cover only stored Labor cost-type lines.","rateBasis":"Labor priced at what a remodeler pays a trade subcontractor for the work (the sub's price, which carries the sub's own overhead and profit), researched by three AI systems against a stated mid-market scenario and reconciled by median; none of the remodeler's own overhead or profit; no specific locality selected. Supply-and-install coverage as stated per row."},"license":{"policy":"Clamp permits attributed citation, quotation and reproduction of this published example, including commercial editorial use, contractor project estimating, research, search indexing, and retrieval or caching used to produce attributed answers. This permission does not authorize republication of substantially all Clamp-authored snapshot content as a competing commercial cost-reference collection, whether assembled from one or multiple snapshots. Contact Clamp for that permission. These terms apply only to rights Clamp owns or may license. They do not restrict independent facts, independently developed data, fair use or other statutory rights. Third-party material remains subject to its applicable terms. Attribution should identify Clamp, the scenario/version and its canonical URL. Clamp Snapshot Rights Policy 1.0, working draft subject to counsel review.","redistributionClearance":"All published inputs are Clamp’s internal researched baseline (multi-source AI research synthesized by Clamp); no third-party licensed datasets are incorporated.","reference":"Clamp Snapshot Rights Policy 1.0","version":"Clamp Snapshot Rights Policy 1.0"},"licenseReference":"Clamp Snapshot Rights Policy 1.0","licenseVersion":"Clamp Snapshot Rights Policy 1.0","limitations":["Modeled examples are not bids, completed-job records, or national averages.","Rates are researched baselines with stated windows; local quotes vary.","Concealed damage, permits beyond stated scope, and unstated finish tiers are excluded unless itemized.","Typical conditions are assumed."],"markupIllustrations":[{"grossMargin":0.23076923076923075,"markup":0.3,"sellingPriceCents":1801589},{"grossMargin":0.3333333333333333,"markup":0.5,"sellingPriceCents":2078757},{"grossMargin":0.4444444444444445,"markup":0.8,"sellingPriceCents":2494508}],"modifierInputsVersion":"209b713e","rateInputsVersion":"209b713e","rateObservationWindow":{"end":"2026-10-26","start":"2026-10-06"},"review":{"approvalTimestamp":"","reviewDate":"","reviewer":"Emmanuel Forge","scope":"PROPOSED: scope selection, arithmetic, and provenance mapping; not independent market-rate verification"},"rows":[{"assembly":{"name":"Shower / Tub System Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":45000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":45000,"otherCents":0},"costType":"Allowances","id":"alcove-tub-allowance","name":"Alcove Tub Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":45000,"trade":"Plumbing","unit":"ea","unitPriceCents":45000},{"assembly":{"name":"Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":32500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":6500,"otherCents":0},"costType":"Allowances","id":"bathroom-accessory-allowance","name":"Bathroom Accessory Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":5,"quantityContract":{"deductions":0,"derivation":"Bathroom Finish Package from accessory count 5, customer supplied accessories false = 5 ea.","net":5,"purchased":5,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":32500,"trade":"Carpentry","unit":"ea","unitPriceCents":6500},{"assembly":{"name":"Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":24000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":4800,"materialCents":0,"otherCents":0},"costType":"Labor","id":"bathroom-accessory-install-labor","name":"Bathroom Accessory Install Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":5,"quantityContract":{"deductions":0,"derivation":"Bathroom Finish Package from accessory count 5 = 5 ea.","net":5,"purchased":5,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":24000,"trade":"Carpentry","unit":"ea","unitPriceCents":4800},{"assembly":{"name":"Bathroom Electrical & Exhaust Rough-In","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":21500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":21500,"otherCents":0},"costType":"Allowances","id":"bathroom-exhaust-fan-unit-allowance","name":"Bathroom Exhaust Fan Unit","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Bathroom Electrical & Exhaust Rough-In = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":21500,"trade":"Electrical","unit":"ea","unitPriceCents":21500},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":7200,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":450,"materialCents":0,"otherCents":0},"costType":"Labor","id":"bathroom-tile-edge-trim-install-labor","name":"Tile Edge Trim Install Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":16,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation = 16 lf.","net":16,"purchased":16,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":7200,"trade":"Tile","unit":"lf","unitPriceCents":450},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":10400,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":650,"otherCents":0},"costType":"Materials","id":"bathroom-tile-edge-trim-materials","name":"Tile Edge Trim Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":16,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation = 16 lf.","net":16,"purchased":16,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":10400,"trade":"Tile","unit":"lf","unitPriceCents":650},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":18600,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":200,"materialCents":0,"otherCents":0},"costType":"Labor","id":"bathroom-tile-grout-install-labor","name":"Tile Grout Install Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-25","reference":"Private source","visibility":"private"}],"quantity":93,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from shower floor sf 0 = 93 sf.","net":93,"purchased":93,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":18600,"trade":"Tile","unit":"sf","unitPriceCents":200},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":4185,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":45,"otherCents":0},"costType":"Materials","id":"bathroom-tile-grout-materials","name":"Tile Grout Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":93,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from shower floor sf 0 = 93 sf.","net":93,"purchased":93,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":4185,"trade":"Tile","unit":"sf","unitPriceCents":45},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":93000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":1000,"materialCents":0,"otherCents":0},"costType":"Labor","id":"bathroom-tile-install-labor","name":"Bathroom Tile Install Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":93,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from accent tile sf 0; Bathroom Tile Installation from shower floor sf 0 = 93 sf.","net":93,"purchased":93,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":93000,"trade":"Tile","unit":"sf","unitPriceCents":1000},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":16940,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":550,"otherCents":0},"costType":"Allowances","id":"bathroom-tile-material-allowance","name":"Floor Tile Material Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":30.8,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from shower floor sf 0, tile type ceramic, floor tile type porcelain; Bathroom Tile Installation from shower floor sf 0, tile type ceramic, floor tile type porcelain; Bathroom Tile Installation from shower floor sf 0, tile type ceramic; Bathroom Tile Installation from shower floor sf 0; Bathroom Tile Installation from shower floor sf 0, tile type ceramic = 30.8 sf.","net":30.8,"purchased":30.8,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":16940,"trade":"Tile","unit":"sf","unitPriceCents":550},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":8696,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":85,"otherCents":0},"costType":"Materials","id":"bathroom-tile-setting-materials","name":"Bath Tile Setting Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":102.3,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from shower floor sf 0 = 102.3 sf.","net":102.3,"purchased":102.3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":8696,"trade":"Tile","unit":"sf","unitPriceCents":85},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":16088,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":225,"otherCents":0},"costType":"Allowances","id":"bathroom-wall-tile-material-allowance","name":"Wall Tile Material Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":71.5,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from accent tile sf 0, tile type ceramic; Bathroom Tile Installation from accent tile sf 0, tile type ceramic; Bathroom Tile Installation from accent tile sf 0; Bathroom Tile Installation from accent tile sf 0, tile type ceramic = 71.5 sf.","net":71.5,"purchased":71.5,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":16088,"trade":"Tile","unit":"sf","unitPriceCents":225},{"assembly":{"name":"Full Bathroom Remodel Composite + Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":675,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":225,"otherCents":0},"costType":"Materials","id":"cabinet-install-fasteners-shims","name":"Vanity Install Fasteners and Shims","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-25","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Full Bathroom Remodel Composite; Vanity Install from sink style vanity, vanity lf 3 = 3 lf.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":675,"trade":"Vanity & Fixtures","unit":"lf","unitPriceCents":225},{"assembly":{"name":"Bathroom Demolition","version":"209b713e"},"componentExtendedCosts":{"laborCents":37500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":12500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"demo-fixture-bath","name":"Bathroom Fixture Removal","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Bathroom Demolition from fixture count 3, existing surround type tile; Bathroom Demolition from fixture count 3, existing surround type tile = 3 ea.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":37500,"trade":"Demo & Prep","unit":"ea","unitPriceCents":12500},{"assembly":{"name":"Bathroom Demolition","version":"209b713e"},"componentExtendedCosts":{"laborCents":18000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":450,"materialCents":0,"otherCents":0},"costType":"Labor","id":"demo-floor-tile","name":"Tile Floor Removal","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":40,"quantityContract":{"deductions":0,"derivation":"Bathroom Demolition from bath sf 40; Bathroom Demolition from bath sf 40 = 40 sf.","net":40,"purchased":40,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":18000,"trade":"Demo & Prep","unit":"sf","unitPriceCents":450},{"assembly":{"name":"Bathroom Demolition","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":0,"otherCents":22500},"componentRates":{"laborCents":0,"materialCents":0,"otherCents":22500},"costType":"Dump fees","id":"demo-haul-off-load","name":"Debris Haul-Off (per Load)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Bathroom Demolition from bath sf 40; Bathroom Demolition from bath sf 40 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":22500,"trade":"Demo & Prep","unit":"ea","unitPriceCents":22500},{"assembly":{"name":"Bathroom Demolition","version":"209b713e"},"componentExtendedCosts":{"laborCents":30875,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":475,"materialCents":0,"otherCents":0},"costType":"Labor","id":"demo-tile-wall","name":"Wall Tile Removal","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":65,"quantityContract":{"deductions":0,"derivation":"Bathroom Demolition from existing surround type tile; Bathroom Demolition from existing surround type tile = 65 sf.","net":65,"purchased":65,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":30875,"trade":"Demo & Prep","unit":"sf","unitPriceCents":475},{"assembly":{"name":"Full Bathroom Remodel Composite + Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":25000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":12500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"drywall-patch-repair-labor","name":"Drywall Patch Repair","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":2,"quantityContract":{"deductions":0,"derivation":"Full Bathroom Remodel Composite from is full gut false, shower system type tub shower combo, existing wall tile sf 65; Vanity Install from has wall mount faucet false = 2 ea.","net":2,"purchased":2,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":25000,"trade":"Drywall","unit":"ea","unitPriceCents":12500},{"assembly":{"name":"Bathroom Electrical & Exhaust Rough-In","version":"209b713e"},"componentExtendedCosts":{"laborCents":32500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":32500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"exhaust-fan-install-labor","name":"Exhaust Fan Install and Wiring Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Bathroom Electrical & Exhaust Rough-In = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":32500,"trade":"Electrical","unit":"ea","unitPriceCents":32500},{"assembly":{"name":"Full Bathroom Remodel Composite","version":"209b713e"},"componentExtendedCosts":{"laborCents":29000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":29000,"materialCents":0,"otherCents":0},"costType":"Labor","id":"final-punch-walk-labor","name":"Final Punch Walk Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Full Bathroom Remodel Composite = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":29000,"trade":"Permits & PM","unit":"ea","unitPriceCents":29000},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":22500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":22500,"otherCents":0},"costType":"Allowances","id":"fixture-allowance-sink-lavatory","name":"Bathroom Sink Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Vanity Install from sink style vanity = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":22500,"trade":"Vanity & Fixtures","unit":"ea","unitPriceCents":22500},{"assembly":{"name":"Toilet Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":35000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":35000,"otherCents":0},"costType":"Allowances","id":"fixture-allowance-toilet","name":"Toilet Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Toilet Install = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":35000,"trade":"Plumbing","unit":"ea","unitPriceCents":35000},{"assembly":{"name":"Shower / Tub System Installation + Toilet Install + Bathroom Fixture Accessories","version":"209b713e"},"componentExtendedCosts":{"laborCents":65000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":32500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"fixture-set-per-fixture","name":"Fixture Set Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":2,"quantityContract":{"deductions":0,"derivation":"Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Toilet Install; Bathroom Fixture Accessories; Shower / Tub System Installation; Shower / Tub System Installation = 2 ea.","net":2,"purchased":2,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":65000,"trade":"Plumbing","unit":"ea","unitPriceCents":32500},{"assembly":{"name":"Full Bathroom Remodel Composite","version":"209b713e"},"componentExtendedCosts":{"laborCents":4500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":4500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"floor-transition-install-labor","name":"Floor Transition Install","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Full Bathroom Remodel Composite = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":4500,"trade":"Flooring","unit":"ea","unitPriceCents":4500},{"assembly":{"name":"Full Bathroom Remodel Composite","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":3500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":3500,"otherCents":0},"costType":"Materials","id":"floor-transition-pieces-materials","name":"Floor Transition Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Full Bathroom Remodel Composite = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":3500,"trade":"Flooring","unit":"ea","unitPriceCents":3500},{"assembly":{"name":"Toilet Install + Vanity Install + Bathroom Finish Package + Bathroom Fixture Accessories","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":8500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":8500,"otherCents":0},"costType":"Materials","id":"generic-install-consumables","name":"Installation Supplies","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Toilet Install; Vanity Install; Bathroom Finish Package; Bathroom Fixture Accessories = 1 ls.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":8500,"trade":"General","unit":"ls","unitPriceCents":8500},{"assembly":{"name":"Bathroom Electrical & Exhaust Rough-In","version":"209b713e"},"componentExtendedCosts":{"laborCents":8500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":8500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"gfci-afci-device-install-labor","name":"GFCI Receptacle or AFCI Breaker Install","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Bathroom Electrical & Exhaust Rough-In = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":8500,"trade":"Electrical","unit":"ea","unitPriceCents":8500},{"assembly":{"name":"Bathroom Electrical & Exhaust Rough-In + Toilet Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":2200,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":2200,"otherCents":0},"costType":"Allowances","id":"gfci-unit-allowance","name":"GFCI Unit","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Bathroom Electrical & Exhaust Rough-In; Toilet Install = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":2200,"trade":"Electrical","unit":"ea","unitPriceCents":2200},{"assembly":{"name":"Bathroom Demolition + Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":13320,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":60,"materialCents":0,"otherCents":0},"costType":"Labor","id":"interior-paint-apply-labor","name":"Interior Paint Apply Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":222,"quantityContract":{"deductions":0,"derivation":"Bathroom Demolition; Bathroom Finish Package; Bathroom Demolition = 222 sf.","net":222,"purchased":222,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":13320,"trade":"Painting","unit":"sf","unitPriceCents":60},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":22500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":22500,"otherCents":0},"costType":"Allowances","id":"lavatory-faucet-allowance","name":"Bathroom Faucet Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Vanity Install = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":22500,"trade":"Vanity & Fixtures","unit":"ea","unitPriceCents":22500},{"assembly":{"name":"Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":30000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":15000,"otherCents":0},"costType":"Allowances","id":"light-fixture-allowance","name":"Light Fixture Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":2,"quantityContract":{"deductions":0,"derivation":"Bathroom Finish Package from light fixture count 2 = 2 ea.","net":2,"purchased":2,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":30000,"trade":"Electrical","unit":"ea","unitPriceCents":15000},{"assembly":{"name":"Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":25000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":12500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"light-fixture-install-labor","name":"Light Fixture Install","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":2,"quantityContract":{"deductions":0,"derivation":"Bathroom Finish Package from light fixture count 2 = 2 ea.","net":2,"purchased":2,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":25000,"trade":"Electrical","unit":"ea","unitPriceCents":12500},{"assembly":{"name":"Bathroom Electrical & Exhaust Rough-In","version":"209b713e"},"componentExtendedCosts":{"laborCents":13500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":4500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"outlet-switch-install-labor","name":"Outlet/Switch Install","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-25","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Bathroom Electrical & Exhaust Rough-In = 3 ea.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":13500,"trade":"Electrical","unit":"ea","unitPriceCents":4500},{"assembly":{"name":"Bathroom Electrical & Exhaust Rough-In","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":2400,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":800,"otherCents":0},"costType":"Allowances","id":"outlet-unit-allowance","name":"Outlet Unit","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Bathroom Electrical & Exhaust Rough-In = 3 ea.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":2400,"trade":"Electrical","unit":"ea","unitPriceCents":800},{"assembly":{"name":"Bathroom Demolition + Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":6720,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":4800,"otherCents":0},"costType":"Allowances","id":"paint-premium-allowance","name":"Premium Paint Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1.4,"quantityContract":{"deductions":0,"derivation":"Bathroom Demolition; Bathroom Finish Package; Bathroom Demolition = 1.4 gallon.","net":1.4,"purchased":1.4,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":6720,"trade":"Painting","unit":"gallon","unitPriceCents":4800},{"assembly":{"name":"Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":4004,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":22,"materialCents":0,"otherCents":0},"costType":"Labor","id":"paint-prep-labor","name":"Paint Prep Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":182,"quantityContract":{"deductions":0,"derivation":"Bathroom Finish Package = 182 sf.","net":182,"purchased":182,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":4004,"trade":"Painting","unit":"sf","unitPriceCents":22},{"assembly":{"name":"Bathroom Rough Plumbing + Shower / Tub System Installation + Toilet Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":12600,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":4200,"otherCents":0},"costType":"Materials","id":"plumbing-rough-consumables","name":"Rough Plumbing Consumables","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Bathroom Rough Plumbing from fixture count 3; Shower / Tub System Installation from drain relocation required false; Shower / Tub System Installation from drain relocation required false; Shower / Tub System Installation from drain relocation required false; Toilet Install from toilet type standard two piece; Shower / Tub System Installation from drain relocation required false; Shower / Tub System Installation from drain relocation required false = 3 ea.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":12600,"trade":"Plumbing","unit":"ea","unitPriceCents":4200},{"assembly":{"name":"Bathroom Rough Plumbing","version":"209b713e"},"componentExtendedCosts":{"laborCents":67500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":22500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"plumbing-stub-out-refresh-labor","name":"Plumbing Stub-Out Update Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Bathroom Rough Plumbing from fixture count 3 = 3 ea.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":67500,"trade":"Plumbing","unit":"ea","unitPriceCents":22500},{"assembly":{"name":"Shower / Tub System Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":28500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":28500,"otherCents":0},"costType":"Allowances","id":"shower-trim-allowance","name":"Shower Valve Trim Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":28500,"trade":"Plumbing","unit":"ea","unitPriceCents":28500},{"assembly":{"name":"Bathroom Rough Plumbing + Shower / Tub System Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":42500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":42500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"shower-tub-valve-set","name":"Shower Valve Set and Trim Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Bathroom Rough Plumbing; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":42500,"trade":"Plumbing","unit":"ea","unitPriceCents":42500},{"assembly":{"name":"Bathroom Rough Plumbing + Shower / Tub System Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":20000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":20000,"otherCents":0},"costType":"Allowances","id":"shower-valve-rough-body-allowance","name":"Shower Valve Rough-In Body","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Bathroom Rough Plumbing; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":20000,"trade":"Plumbing","unit":"ea","unitPriceCents":20000},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":0,"otherCents":61750},"componentRates":{"laborCents":0,"materialCents":0,"otherCents":950},"costType":"Subcontract","id":"shower-wall-foam-board-sealant-installed","name":"Shower Wall Foam Board, Sealant Seams (Wedi, GoBoard), Installed","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-26","reference":"Private source","visibility":"private"}],"quantity":65,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from waterproofing system wedi = 65 sf.","net":65,"purchased":65,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":61750,"trade":"Tile","unit":"sf","unitPriceCents":950},{"assembly":{"name":"Toilet Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":4500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":1500,"otherCents":0},"costType":"Allowances","id":"shutoff-valve-allowance","name":"Shutoff Valve","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Toilet Install from shutoff upgrade count -1 = 3 ea.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":4500,"trade":"Plumbing","unit":"ea","unitPriceCents":1500},{"assembly":{"name":"Toilet Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":43500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":14500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"shutoff-valve-install-labor","name":"Shutoff Valve Install","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Toilet Install from shutoff upgrade count -1 = 3 ea.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":43500,"trade":"Plumbing","unit":"ea","unitPriceCents":14500},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":4500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":4500,"otherCents":0},"costType":"Materials","id":"sink-trap-supply-materials","name":"Sink Trap and Supplies","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Vanity Install = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":4500,"trade":"Vanity & Fixtures","unit":"ea","unitPriceCents":4500},{"assembly":{"name":"Bathroom Demolition","version":"209b713e"},"componentExtendedCosts":{"laborCents":30000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":30000,"materialCents":0,"otherCents":0},"costType":"Labor","id":"site-protection-room-labor","name":"Site Protection, One Room (per job)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Bathroom Demolition; Bathroom Demolition = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":30000,"trade":"Demo & Prep","unit":"ea","unitPriceCents":30000},{"assembly":{"name":"Bathroom Tile Installation + Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":0,"otherCents":23940},"componentRates":{"laborCents":0,"materialCents":0,"otherCents":4200},"costType":"Subcontract","id":"stone-countertop-fabricate-labor","name":"Vanity Top Fabrication","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-26","reference":"Private source","visibility":"private"}],"quantity":5.7,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from accent tile sf 0; Vanity Install from sink style vanity, countertop sf 0, vanity lf 3; Vanity Install from sink style vanity, countertop sf 0, vanity lf 3; Vanity Install from vanity lf 3 = 5.7 sf.","net":5.7,"purchased":5.7,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":23940,"trade":"Vanity & Fixtures","unit":"sf","unitPriceCents":4200},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":0,"otherCents":12540},"componentRates":{"laborCents":0,"materialCents":0,"otherCents":2200},"costType":"Subcontract","id":"stone-countertop-install-labor","name":"Vanity Top Install","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-26","reference":"Private source","visibility":"private"}],"quantity":5.7,"quantityContract":{"deductions":0,"derivation":"Vanity Install from sink style vanity, countertop sf 0, vanity lf 3 = 5.7 sf.","net":5.7,"purchased":5.7,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":12540,"trade":"Vanity & Fixtures","unit":"sf","unitPriceCents":2200},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":31350,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":5500,"otherCents":0},"costType":"Allowances","id":"stone-countertop-material-allowance","name":"Vanity Top Material Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":5.7,"quantityContract":{"deductions":0,"derivation":"Vanity Install from sink style vanity, countertop sf 0, vanity lf 3 = 5.7 sf.","net":5.7,"purchased":5.7,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":31350,"trade":"Vanity & Fixtures","unit":"sf","unitPriceCents":5500},{"assembly":{"name":"Toilet Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":4500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":4500,"otherCents":0},"costType":"Materials","id":"toilet-setting-materials","name":"Toilet Setting Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Toilet Install = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":4500,"trade":"Plumbing","unit":"ea","unitPriceCents":4500},{"assembly":{"name":"Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":10625,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":425,"materialCents":0,"otherCents":0},"costType":"Labor","id":"trim-baseboard-casing-install","name":"Baseboard and Casing Install","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":25,"quantityContract":{"deductions":0,"derivation":"Bathroom Finish Package = 25 lf.","net":25,"purchased":25,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":10625,"trade":"Carpentry","unit":"lf","unitPriceCents":425},{"assembly":{"name":"Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":5775,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":210,"otherCents":0},"costType":"Materials","id":"trim-materials-paint-grade","name":"Trim Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":27.5,"quantityContract":{"deductions":0,"derivation":"Bathroom Finish Package = 27.5 lf.","net":27.5,"purchased":27.5,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":5775,"trade":"Carpentry","unit":"lf","unitPriceCents":210},{"assembly":{"name":"Bathroom Finish Package","version":"209b713e"},"componentExtendedCosts":{"laborCents":5625,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":225,"materialCents":0,"otherCents":0},"costType":"Labor","id":"trim-paint-apply-labor","name":"Trim Paint Apply Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":25,"quantityContract":{"deductions":0,"derivation":"Bathroom Finish Package = 25 lf.","net":25,"purchased":25,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":5625,"trade":"Painting","unit":"lf","unitPriceCents":225},{"assembly":{"name":"Shower / Tub System Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":6500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":6500,"otherCents":0},"costType":"Materials","id":"tub-setting-materials","name":"Alcove Tub Setting Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":6500,"trade":"Plumbing","unit":"ea","unitPriceCents":6500},{"assembly":{"name":"Shower / Tub System Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":6500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":6500,"otherCents":0},"costType":"Materials","id":"tub-waste-overflow-materials","name":"Tub Waste and Overflow Kit","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation; Shower / Tub System Installation = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":6500,"trade":"Plumbing","unit":"ea","unitPriceCents":6500},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":5320,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":190,"materialCents":0,"otherCents":0},"costType":"Labor","id":"uncoupling-membrane-labor","name":"Uncoupling Membrane Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":28,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from includes heated floor false, floor underlayment uncoupling = 28 sf.","net":28,"purchased":28,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":5320,"trade":"Tile","unit":"sf","unitPriceCents":190},{"assembly":{"name":"Bathroom Tile Installation","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":6860,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":245,"otherCents":0},"costType":"Materials","id":"uncoupling-membrane-materials","name":"Uncoupling Membrane Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":28,"quantityContract":{"deductions":0,"derivation":"Bathroom Tile Installation from includes heated floor false, floor underlayment uncoupling = 28 sf.","net":28,"purchased":28,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":6860,"trade":"Tile","unit":"sf","unitPriceCents":245},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":96000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":32000,"otherCents":0},"costType":"Allowances","id":"vanity-cabinet-allowance","name":"Vanity Cabinet Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Vanity Install from sink style vanity, vanity lf 3 = 3 lf.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":96000,"trade":"Vanity & Fixtures","unit":"lf","unitPriceCents":32000},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":53750,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":53750,"materialCents":0,"otherCents":0},"costType":"Labor","id":"vanity-install-labor","name":"Vanity Install Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Vanity Install from sink style vanity = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":53750,"trade":"Vanity & Fixtures","unit":"ea","unitPriceCents":53750},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":0,"materialCents":20000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":20000,"otherCents":0},"costType":"Allowances","id":"vanity-mirror-allowance","name":"Vanity Mirror or Medicine Cabinet (per unit)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Vanity Install from mirror count 1, recessed cabinet count 0, customer supplied mirror false; Vanity Install from recessed cabinet count 0, mirror count 1, customer supplied mirror false = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":20000,"trade":"Vanity & Fixtures","unit":"ea","unitPriceCents":20000},{"assembly":{"name":"Vanity Install","version":"209b713e"},"componentExtendedCosts":{"laborCents":8500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":8500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"vanity-mirror-install-labor","name":"Vanity Mirror Install (per unit)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Vanity Install from mirror count 1 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":8500,"trade":"Vanity & Fixtures","unit":"ea","unitPriceCents":8500},{"assembly":{"name":"Full Bathroom Remodel Composite","version":"209b713e"},"componentExtendedCosts":{"laborCents":11400,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":3800,"materialCents":0,"otherCents":0},"costType":"Labor","id":"vanity-wall-patch-labor","name":"Vanity Wall Patch Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3,"quantityContract":{"deductions":0,"derivation":"Full Bathroom Remodel Composite from sink style vanity, is full gut false, vanity lf 3 = 3 lf.","net":3,"purchased":3,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":11400,"trade":"Vanity & Fixtures","unit":"lf","unitPriceCents":3800}],"scenario":{"allowanceTreatment":"PROPOSED: allowance lines (tub unit, ceramic wall tile, porcelain floor tile, vanity, top, sink, faucet, toilet, fan, light fixtures, accessories, mirror) are included as material components at their baseline amount; the selection sets the final cost.","assumptions":["Existing floor joists and subfloor are structurally sound with no water damage","All rough plumbing and electrical connections remain in current locations","Wall framing and drywall behind tile are intact with no concealed rot or mold","Electrical circuits have adequate capacity for new fixtures without panel upgrade","Standard 8-foot ceiling height and no concealed structural obstructions","Transcript did not specify a finish tier (basic/standard/premium); assumed standard given no descriptors of high-end or budget materials.","Attic or ceiling cavity access exists within 10 feet of fan location","Electrical circuit capacity exists for fan load without panel upgrade","Exterior wall or soffit is accessible for termination within 10 linear feet of fan","Ceiling framing is standard 16-inch on-center joists with no obstructions"],"baselineConditions":"PROPOSED: typical project scale, complexity, access, and occupied baseline conditions.","dimensions":[{"label":"Room area","unit":"sq ft","value":40},{"label":"Floor tile area","unit":"sq ft","value":28},{"label":"Tub surround tile area","unit":"sq ft","value":65}],"exclusions":["Moving drain or supply line locations (rough plumbing stays where it is; the stub-outs are refreshed in place)","Electrical circuit additions or panel work (existing circuits reused)","Wall removal or layout changes","Subfloor replacement or structural framing repair","Window or door replacement","Ceiling drywall repair or texture matching beyond 6-inch perimeter of fan opening","Attic insulation relocation or replacement disturbed during duct routing","Roof shingle removal or flashing work","Permit requirements vary by jurisdiction and must be confirmed locally.","Lighting work depends on the existing circuit and selected fixtures.","For homes built before 1978, follow applicable lead-safe renovation requirements before disturbing painted surfaces.","Fan duct or termination changes (the fan swaps onto the existing duct and roof termination).","Permit fees (Clamp's estimate carries them as a separate allowance with a range; not in these rows)"],"finishLevel":"Same-layout example","geographicBasis":"PROPOSED: Clamp researched baseline rates, reconciled across three AI systems against a stated mid-market scenario; no specific locality and no measured market median","geography":"PROPOSED: no specific locality is selected, and no statistically measured market median is claimed.","inclusions":["Tear-out of the tub, tile and fixtures, with room-level protection and one debris load hauled off","Foam board tile backer with sealed seams (the wall system), ceramic wall tile, grout, edge trim and a flood test","Uncoupling membrane under the floor tile","Tub-shower unit, valve body and trim in the existing opening, with the stub-outs, trap arm and flange refreshed at the three fixtures and new shutoff valves at the sink and toilet","Vanity, countertop, sink and faucet","Toilet with wax ring and supply line","Exhaust fan swap on the existing duct and termination","One GFCI device and three devices reset in their existing boxes","Two light fixtures, bought and installed","Five bath accessories (towel bar, ring, paper holder, hooks), bought and mounted","Mirror over the vanity, bought and hung","Interior painting of walls, ceiling and trim","Drywall patch behind the vanity and two patches in the wet area","Baseboard replaced and painted","A final punch walk"],"kind":"5×8 Bathroom Remodel","scope":["Same-layout bathroom remodel","60×30 tub replaced in place","65 square feet of tiled tub surround to ceiling","New vanity with countertop and faucet","New toilet","Exhaust fan replacement","Two light fixtures, five bath accessories and a mirror","Wall and ceiling paint","28 square feet of porcelain floor tile in the open floor area"]},"schemaVersion":"1.0","tradeSubtotals":{"Carpentry":72900,"Demo & Prep":138875,"Drywall":25000,"Electrical":135600,"Flooring":8000,"General":8500,"Painting":29669,"Permits & PM":29000,"Plumbing":381600,"Tile":249039,"Vanity & Fixtures":307655},"version":"v5"}
