{"conditions":[],"costTypeSubtotals":{"Allowances":92400,"Dump fees":29000,"Labor":179425,"Materials":37700},"currency":"USD","date":"2026-10-12","directCostCents":338525,"explicitStates":{"completenessState":"PROPOSED: frozen draft has 14 stored lines and no separately assessed tax or contingency.","contingencyTreatment":"PROPOSED: excluded, not assessed.","markupBase":"Direct job cost.","taxTreatment":"PROPOSED: excluded, not assessed."},"exporterVersion":"3","id":"dishwasher-leak-floor-repair-240/v1","labor":{"coverage":"PROPOSED: labor rows cover only stored Labor cost-type lines; Subcontract rows are the subcontractor's all-in price to the contractor.","rateBasis":"Loaded labor rates for a mid-market residential contractor (wages plus employer burden), median U.S. market; supply-and-install coverage as stated per row."},"license":{"policy":"Clamp permits attributed citation, quotation and reproduction of this published example, including commercial editorial use, contractor project estimating, research, search indexing, and retrieval or caching used to produce attributed answers. This permission does not authorize republication of substantially all Clamp-authored snapshot content as a competing commercial cost-reference collection, whether assembled from one or multiple snapshots. Contact Clamp for that permission. These terms apply only to rights Clamp owns or may license. They do not restrict independent facts, independently developed data, fair use or other statutory rights. Third-party material remains subject to its applicable terms. Attribution should identify Clamp, the scenario/version and its canonical URL. Clamp Snapshot Rights Policy 1.0, working draft subject to counsel review.","redistributionClearance":"All published inputs are Clamp’s internal researched baseline (multi-source AI research synthesized by Clamp); no third-party licensed datasets are incorporated.","reference":"Clamp Snapshot Rights Policy 1.0","version":"Clamp Snapshot Rights Policy 1.0"},"licenseReference":"Clamp Snapshot Rights Policy 1.0","licenseVersion":"Clamp Snapshot Rights Policy 1.0","limitations":["Modeled examples are not bids, completed-job records, or national averages.","Rates are researched baselines with stated windows; local quotes vary.","Typical conditions are assumed.","Permit and inspection fees are excluded; requirements vary by jurisdiction."],"markupIllustrations":[{"grossMargin":0.23076923076923075,"markup":0.3,"sellingPriceCents":440083},{"grossMargin":0.3333333333333333,"markup":0.5,"sellingPriceCents":507788},{"grossMargin":0.4444444444444445,"markup":0.8,"sellingPriceCents":609345}],"modifierInputsVersion":"46f4dff6","rateInputsVersion":"46f4dff6","rateObservationWindow":{"end":"2026-10-06","start":"2026-10-06"},"review":{"approvalTimestamp":"","reviewDate":"","reviewer":"Emmanuel Forge","scope":"PROPOSED: scope selection, arithmetic, and provenance mapping; not independent market-rate verification"},"rows":[{"assembly":{"name":"Dishwasher Install / Replace","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":0,"materialCents":0,"otherCents":6500},"componentRates":{"laborCents":0,"materialCents":0,"otherCents":6500},"costType":"Dump fees","id":"appliance-haul-disposal","name":"Appliance Haul-Away and Recycling","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Dishwasher Install / Replace from haul away true, dishwasher count 1, install mode replacement existing connections = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":6500,"trade":"Appliances","unit":"ea","unitPriceCents":6500},{"assembly":{"name":"Floating Flooring Install","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":26325,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":325,"materialCents":0,"otherCents":0},"costType":"Labor","id":"baseboard-remove-reinstall-labor","name":"Baseboard Remove and Reinstall Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":81,"quantityContract":{"deductions":0,"derivation":"Floating Flooring Install from new base by others false, remove existing floor true, base shoe reset true, floor sf 240 = 81 lf.","net":81,"purchased":81,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":26325,"trade":"Carpentry","unit":"lf","unitPriceCents":325},{"assembly":{"name":"Existing Flooring Demo","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":0,"materialCents":12500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":12500,"otherCents":0},"costType":"Materials","id":"demo-consumables","name":"Demo Consumables and Supplies","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Existing Flooring Demo from floor sf 240 = 1 ls.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":12500,"trade":"Demo & Prep","unit":"ls","unitPriceCents":12500},{"assembly":{"name":"Existing Flooring Demo","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":50400,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":210,"materialCents":0,"otherCents":0},"costType":"Labor","id":"demo-floor-hardwood","name":"Hardwood Floor Removal","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":240,"quantityContract":{"deductions":0,"derivation":"Existing Flooring Demo from floor sf 240 = 240 sf.","net":240,"purchased":240,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":50400,"trade":"Demo & Prep","unit":"sf","unitPriceCents":210},{"assembly":{"name":"Existing Flooring Demo","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":0,"materialCents":0,"otherCents":22500},"componentRates":{"laborCents":0,"materialCents":0,"otherCents":22500},"costType":"Dump fees","id":"demo-haul-off-load","name":"Haul-Off Per Load","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Existing Flooring Demo from floor sf 240 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":22500,"trade":"Demo & Prep","unit":"ea","unitPriceCents":22500},{"assembly":{"name":"Dishwasher Install / Replace","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":27500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":27500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"dishwasher-install-labor","name":"Dishwasher Install Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Dishwasher Install / Replace from dishwasher count 1 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":27500,"trade":"Plumbing","unit":"ea","unitPriceCents":27500},{"assembly":{"name":"Dishwasher Install / Replace","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":12500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":12500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"existing-dishwasher-removal-labor","name":"Existing Dishwasher Removal Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Dishwasher Install / Replace from dishwasher count 1, install mode replacement existing connections = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":12500,"trade":"Plumbing","unit":"ea","unitPriceCents":12500},{"assembly":{"name":"Floating Flooring Install","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":1200,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":5,"materialCents":0,"otherCents":0},"costType":"Labor","id":"floor-protection-setup-labor","name":"Floor Protection Setup Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":240,"quantityContract":{"deductions":0,"derivation":"Floating Flooring Install from floor sf 240 = 240 sf.","net":240,"purchased":240,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":1200,"trade":"Demo & Prep","unit":"sf","unitPriceCents":5},{"assembly":{"name":"Floating Flooring Install","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":0,"materialCents":3500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":3500,"otherCents":0},"costType":"Materials","id":"floor-transition-pieces-materials","name":"Floor Transition Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Floating Flooring Install from doorway count 1; Floating Flooring Install from transition count 0 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":3500,"trade":"Flooring","unit":"ea","unitPriceCents":3500},{"assembly":{"name":"Floating Flooring Install","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":0,"materialCents":13200,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":55,"otherCents":0},"costType":"Materials","id":"floor-underlayment-materials","name":"Floor Underlayment Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":240,"quantityContract":{"deductions":0,"derivation":"Floating Flooring Install from floor sf 240, underlayment type standard foam = 240 sf.","net":240,"purchased":240,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":13200,"trade":"Flooring","unit":"sf","unitPriceCents":55},{"assembly":{"name":"Floating Flooring Install","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":0,"materialCents":8500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":8500,"otherCents":0},"costType":"Materials","id":"flooring-install-consumables","name":"Flooring Install Consumables","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Floating Flooring Install from floor sf 240 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":8500,"trade":"Flooring","unit":"ea","unitPriceCents":8500},{"assembly":{"name":"Floating Flooring Install","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":54000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":225,"materialCents":0,"otherCents":0},"costType":"Labor","id":"flooring-install-lvp-lvt-labor","name":"LVP/LVT Install","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":240,"quantityContract":{"deductions":0,"derivation":"Floating Flooring Install from material type lvp, floor sf 240 = 240 sf.","net":240,"purchased":240,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":54000,"trade":"Flooring","unit":"sf","unitPriceCents":225},{"assembly":{"name":"Floating Flooring Install","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":7500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":7500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"interior-door-threshold-transition-labor","name":"Door Threshold Transition Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Floating Flooring Install from doorway count 1 = 1 each.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":7500,"trade":"Carpentry","unit":"each","unitPriceCents":7500},{"assembly":{"name":"Floating Flooring Install","version":"46f4dff6"},"componentExtendedCosts":{"laborCents":0,"materialCents":92400,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":350,"otherCents":0},"costType":"Allowances","id":"lvp-lvt-material-allowance","name":"LVP/LVT Material Allowance","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":264,"quantityContract":{"deductions":0,"derivation":"Floating Flooring Install from material type lvp, floor sf 240 = 264 sf.","net":264,"purchased":264,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":92400,"trade":"Flooring","unit":"sf","unitPriceCents":350}],"scenario":{"allowanceTreatment":"PROPOSED: the LVP flooring is an allowance at the baseline price; the selected floor sets the final cost.","assumptions":["The subfloor is sound once the flooring is up.","The existing water, drain and power connections serve the new dishwasher.","LVP runs under the dishwasher opening only, not under the cabinets."],"baselineConditions":"PROPOSED: a slow dishwasher leak swelled about 45 sq ft of engineered wood that runs continuously into a breakfast area; no insurance claim; the homeowner supplies the new dishwasher.","dimensions":[{"label":"Floor replaced","unit":"sq ft","value":240},{"label":"Damaged area","unit":"sq ft","value":45}],"exclusions":["Subfloor repair unless the inspection finds it bad; it is a separate line if it is found.","The dishwasher itself; the homeowner supplies it.","Cabinet or countertop work.","Mold remediation."],"finishLevel":"240 sq ft of engineered wood replaced with LVP, cabinets and counters untouched","geographicBasis":"Clamp researched baseline rates, reconciled across three AI systems against a stated mid-market scenario; no specific locality and no measured market median","geography":"No specific locality is selected, and no statistically measured market median is claimed","inclusions":["Floor protection and work area masking","Subfloor leveling and prep when requires-subfloor-prep is true","Underlayment roll-out and seam-tape installation per underlayment-type","Click-lock floating floor installation (LVP, LVT, laminate, bamboo, cork, or engineered hardwood)","Material allowance for selected material-type","Trim cuts and expansion gaps at the perimeter","Adhesive, tape, and installation consumables","Waste factor and overage per manufacturer requirement","Disconnect and remove existing dishwasher","Install new dishwasher unit in existing cabinet opening"],"kind":"Dishwasher Leak Floor Repair","scope":["Pull the old dishwasher, haul it away and inspect underneath","Remove 240 sq ft of engineered wood flooring and haul it off","Install underlayment and new LVP through the kitchen and breakfast area, with one transition","Remove and reset the base molding","Install the homeowner's new dishwasher on the existing connections"]},"schemaVersion":"1.0","tradeSubtotals":{"Appliances":6500,"Carpentry":33825,"Demo & Prep":86600,"Flooring":171600,"Plumbing":40000},"version":"v1"}
