{"conditions":[],"costTypeSubtotals":{"Labor":188500,"Materials":37000},"currency":"USD","date":"2026-10-15","directCostCents":225500,"explicitStates":{"completenessState":"PROPOSED: frozen draft has 4 stored lines and no separately assessed tax or contingency.","contingencyTreatment":"PROPOSED: excluded, not assessed.","markupBase":"Direct job cost.","taxTreatment":"PROPOSED: excluded, not assessed."},"exporterVersion":"3","id":"paint-oil-cabinets/v1","labor":{"coverage":"PROPOSED: labor rows cover only stored Labor cost-type lines; Subcontract rows are the subcontractor's all-in price to the contractor.","rateBasis":"Loaded labor rates for a mid-market residential contractor (wages plus employer burden), median U.S. market; supply-and-install coverage as stated per row."},"license":{"policy":"Clamp permits attributed citation, quotation and reproduction of this published example, including commercial editorial use, contractor project estimating, research, search indexing, and retrieval or caching used to produce attributed answers. This permission does not authorize republication of substantially all Clamp-authored snapshot content as a competing commercial cost-reference collection, whether assembled from one or multiple snapshots. Contact Clamp for that permission. These terms apply only to rights Clamp owns or may license. They do not restrict independent facts, independently developed data, fair use or other statutory rights. Third-party material remains subject to its applicable terms. Attribution should identify Clamp, the scenario/version and its canonical URL. Clamp Snapshot Rights Policy 1.0, working draft subject to counsel review.","redistributionClearance":"All published inputs are Clamp’s internal researched baseline (multi-source AI research synthesized by Clamp); no third-party licensed datasets are incorporated.","reference":"Clamp Snapshot Rights Policy 1.0","version":"Clamp Snapshot Rights Policy 1.0"},"licenseReference":"Clamp Snapshot Rights Policy 1.0","licenseVersion":"Clamp Snapshot Rights Policy 1.0","limitations":["Modeled examples are not bids, completed-job records, or national averages.","Rates are researched baselines with stated windows; local quotes vary.","Typical conditions are assumed.","Permit and inspection fees are excluded; painting rarely needs a permit."],"markupIllustrations":[{"grossMargin":0.23076923076923075,"markup":0.3,"sellingPriceCents":293150},{"grossMargin":0.3333333333333333,"markup":0.5,"sellingPriceCents":338250},{"grossMargin":0.4444444444444445,"markup":0.8,"sellingPriceCents":405900}],"modifierInputsVersion":"95c2687b","rateInputsVersion":"95c2687b","rateObservationWindow":{"end":"2026-10-06","start":"2026-10-06"},"review":{"approvalTimestamp":"","reviewDate":"","reviewer":"Emmanuel Forge","scope":"PROPOSED: scope selection, arithmetic, and provenance mapping; not independent market-rate verification"},"rows":[{"assembly":{"name":"Cabinet Painting / Refinishing","version":"95c2687b"},"componentExtendedCosts":{"laborCents":62500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":2500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"cabinet-box-refinish-labor","name":"Cabinet Box and Face Frame Refinish (per lf)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":25,"quantityContract":{"deductions":0,"derivation":"Cabinet Painting / Refinishing from cabinet lf 25 = 25 lf.","net":25,"purchased":25,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":62500,"trade":"Painting","unit":"lf","unitPriceCents":2500},{"assembly":{"name":"Cabinet Painting / Refinishing","version":"95c2687b"},"componentExtendedCosts":{"laborCents":96000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":4800,"materialCents":0,"otherCents":0},"costType":"Labor","id":"cabinet-door-refinish-labor","name":"Cabinet Door/Drawer Front Refinish (per piece)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":20,"quantityContract":{"deductions":0,"derivation":"Cabinet Painting / Refinishing from door count 20, drawer count 0 = 20 ea.","net":20,"purchased":20,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":96000,"trade":"Painting","unit":"ea","unitPriceCents":4800},{"assembly":{"name":"Cabinet Painting / Refinishing","version":"95c2687b"},"componentExtendedCosts":{"laborCents":0,"materialCents":37000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":1850,"otherCents":0},"costType":"Materials","id":"cabinet-refinish-materials","name":"Cabinet Refinish Materials (per piece)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":20,"quantityContract":{"deductions":0,"derivation":"Cabinet Painting / Refinishing from door count 20, drawer count 0 = 20 ea.","net":20,"purchased":20,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":37000,"trade":"Painting","unit":"ea","unitPriceCents":1850},{"assembly":{"name":"Cabinet Painting / Refinishing","version":"95c2687b"},"componentExtendedCosts":{"laborCents":30000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":30000,"materialCents":0,"otherCents":0},"costType":"Labor","id":"site-protection-room-labor","name":"Site Protection, One Room (per job)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Cabinet Painting / Refinishing = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":30000,"trade":"Demo & Prep","unit":"ea","unitPriceCents":30000}],"scenario":{"allowanceTreatment":"PROPOSED: finish paint is an allowance at a mid-grade price per gallon; the selected product sets the final cost. Lead-safe containment, cleanup and testing lines are allowances until the containment plan is measured.","assumptions":["The cabinets are sound.","Use a primer its maker approves over alkyd for the surface; dull glossy paint where the maker requires it."],"baselineConditions":"PROPOSED: about 25 ft of upper and lower cabinets with old oil-based paint in a 1992 house; the existing hardware stays.","dimensions":[{"label":"Doors and drawer fronts","unit":"count","value":20},{"label":"Cabinet run","unit":"lf","value":25}],"exclusions":["New hardware.","Cabinet interiors.","Countertop or backsplash work."],"finishLevel":"20 doors and drawer fronts plus the boxes and face frames, sprayed and brushed","geographicBasis":"Clamp researched baseline rates, reconciled across three AI systems against a stated mid-market scenario; no specific locality and no measured market median","geography":"No specific locality is selected, and no statistically measured market median is claimed","inclusions":["Doors, drawer fronts, boxes and ends","Hardware when selected"],"kind":"Kitchen Cabinets With Oil Paint","scope":["Remove, label and degrease the doors and drawer fronts","Scuff-sand, bonding primer and two coats of waterborne alkyd enamel, sprayed on the doors and fronts","Brush and roll the boxes and face frames","Rehang and adjust"]},"schemaVersion":"1.0","tradeSubtotals":{"Demo & Prep":30000,"Painting":195500},"version":"v1"}
