{"conditions":[],"costTypeSubtotals":{"Allowances":16224,"Labor":134000,"Materials":16450},"currency":"USD","date":"2026-10-15","directCostCents":166674,"explicitStates":{"completenessState":"PROPOSED: frozen draft has 7 stored lines and no separately assessed tax or contingency.","contingencyTreatment":"PROPOSED: excluded, not assessed.","markupBase":"Direct job cost.","taxTreatment":"PROPOSED: excluded, not assessed."},"exporterVersion":"3","id":"paint-oil-peeling-siding/v1","labor":{"coverage":"PROPOSED: labor rows cover only stored Labor cost-type lines; Subcontract rows are the subcontractor's all-in price to the contractor.","rateBasis":"Loaded labor rates for a mid-market residential contractor (wages plus employer burden), median U.S. market; supply-and-install coverage as stated per row."},"license":{"policy":"Clamp permits attributed citation, quotation and reproduction of this published example, including commercial editorial use, contractor project estimating, research, search indexing, and retrieval or caching used to produce attributed answers. This permission does not authorize republication of substantially all Clamp-authored snapshot content as a competing commercial cost-reference collection, whether assembled from one or multiple snapshots. Contact Clamp for that permission. These terms apply only to rights Clamp owns or may license. They do not restrict independent facts, independently developed data, fair use or other statutory rights. Third-party material remains subject to its applicable terms. Attribution should identify Clamp, the scenario/version and its canonical URL. Clamp Snapshot Rights Policy 1.0, working draft subject to counsel review.","redistributionClearance":"All published inputs are Clamp’s internal researched baseline (multi-source AI research synthesized by Clamp); no third-party licensed datasets are incorporated.","reference":"Clamp Snapshot Rights Policy 1.0","version":"Clamp Snapshot Rights Policy 1.0"},"licenseReference":"Clamp Snapshot Rights Policy 1.0","licenseVersion":"Clamp Snapshot Rights Policy 1.0","limitations":["Modeled examples are not bids, completed-job records, or national averages.","Rates are researched baselines with stated windows; local quotes vary.","Typical conditions are assumed.","Permit and inspection fees are excluded; painting rarely needs a permit."],"markupIllustrations":[{"grossMargin":0.23076923076923075,"markup":0.3,"sellingPriceCents":216676},{"grossMargin":0.3333333333333333,"markup":0.5,"sellingPriceCents":250011},{"grossMargin":0.4444444444444445,"markup":0.8,"sellingPriceCents":300013}],"modifierInputsVersion":"95c2687b","rateInputsVersion":"95c2687b","rateObservationWindow":{"end":"2026-10-06","start":"2026-10-06"},"review":{"approvalTimestamp":"","reviewDate":"","reviewer":"Emmanuel Forge","scope":"PROPOSED: scope selection, arithmetic, and provenance mapping; not independent market-rate verification"},"rows":[{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":50000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":50,"materialCents":0,"otherCents":0},"costType":"Labor","id":"exterior-paint-apply-labor","name":"Exterior Paint Apply Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1000,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding true, paintable sf 500, paintable sf includes trim false, coats 2; Exterior Painting System from soffit sf 0, coats 2 = 1000 sf.","net":1000,"purchased":1000,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":50000,"trade":"Painting","unit":"sf","unitPriceCents":50},{"assembly":{"name":"Exterior Painting System + Exterior Shutters: Add, Replace, Remove or Paint","version":"95c2687b"},"componentExtendedCosts":{"laborCents":0,"materialCents":16224,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":4800,"otherCents":0},"costType":"Allowances","id":"exterior-paint-gallon-allowance","name":"Exterior Paint (per gallon)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":3.38,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding true, paintable sf 500, paintable sf includes trim false, coats 2, paint trim false, trim lf 0, door count 0, porch sf 0, soffit sf 0, window sash count 0, railing lf 0, column count 0; Exterior Shutters: Add, Replace, Remove or Paint = 3.38 gallon.","net":3.38,"purchased":3.38,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":16224,"trade":"Painting","unit":"gallon","unitPriceCents":4800},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":8000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":16,"materialCents":0,"otherCents":0},"costType":"Labor","id":"exterior-paint-pressure-wash-labor","name":"Exterior Paint Pressure Wash Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":500,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding true, paintable sf 500, paintable sf includes trim false, soffit sf 0 = 500 sf.","net":500,"purchased":500,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":8000,"trade":"Painting","unit":"sf","unitPriceCents":16},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":61000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":122,"materialCents":0,"otherCents":0},"costType":"Labor","id":"exterior-scrape-prep-labor","name":"Exterior Scrape and Prep Labor (per sf)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":500,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding true, paintable sf 500, paintable sf includes trim false, surface prep level scrape and prime = 500 sf.","net":500,"purchased":500,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":61000,"trade":"Painting","unit":"sf","unitPriceCents":122},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":15000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":30,"materialCents":0,"otherCents":0},"costType":"Labor","id":"paint-primer-application-labor","name":"Paint Primer Application Labor","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":500,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding true, paintable sf 500, paintable sf includes trim false, primer scope full prime all surfaces; Exterior Painting System from soffit sf 0, existing finish peeling over oil, primer scope full prime all surfaces = 500 sf.","net":500,"purchased":500,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":15000,"trade":"Painting","unit":"sf","unitPriceCents":30},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":0,"materialCents":4000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":3200,"otherCents":0},"costType":"Materials","id":"paint-primer-materials","name":"Paint and Primer Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1.25,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding true, paintable sf 500, paintable sf includes trim false, primer scope full prime all surfaces; Exterior Painting System from soffit sf 0, existing finish peeling over oil, primer scope full prime all surfaces = 1.25 gallon.","net":1.25,"purchased":1.25,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":4000,"trade":"Painting","unit":"gallon","unitPriceCents":3200},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":0,"materialCents":12450,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":15000,"otherCents":0},"costType":"Materials","id":"paint-sundries-materials","name":"Paint Sundries Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":0.83,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding true, paintable sf 500, soffit sf 0, paint trim false, trim lf 0, railing lf 0, window sash count 0, door count 0, porch sf 0 = 0.83 ls.","net":0.83,"purchased":0.83,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":12450,"trade":"Painting","unit":"ls","unitPriceCents":15000}],"scenario":{"allowanceTreatment":"PROPOSED: finish paint is an allowance at a mid-grade price per gallon; the selected product sets the final cost. Lead-safe containment, cleanup and testing lines are allowances until the containment plan is measured.","assumptions":["Heavy peeling runs about twice an ordinary scrape.","Use a primer its maker approves over alkyd for the surface; dull glossy paint where the maker requires it."],"baselineConditions":"PROPOSED: latex peeling off old oil paint on the south side of a 1985 house, about 500 sq ft of wood clapboard.","dimensions":[{"label":"Siding","unit":"sq ft","value":500}],"exclusions":["Wood repair and the moisture source behind the peeling.","Trim."],"finishLevel":"500 sq ft of clapboard scraped to sound paint, primed and painted","geographicBasis":"Clamp researched baseline rates, reconciled across three AI systems against a stated mid-market scenario; no specific locality and no measured market median","geography":"No specific locality is selected, and no statistically measured market median is claimed","inclusions":["Pressure washing of all paintable surfaces","Scraping loose or failing paint","Caulking gaps at trim and siding joints","Spot or full primer application per parameter selection","Two-coat paint application to body and trim","Paint and primer material supply","Drop cloths, masking, and protective covering","Lead-safe protocol compliance for pre-1978 homes"],"kind":"Latex Peeling Off Oil Siding","scope":["Wash","Scrape and sand all unsound coating back to sound paint (heavy peeling) and feather the edges","Spot-prime bare wood, then a full coat of exterior oil primer","Two coats of exterior acrylic"]},"schemaVersion":"1.0","tradeSubtotals":{"Painting":166674},"version":"v1"}
