{"conditions":[],"costTypeSubtotals":{"Allowances":5280,"Labor":291500,"Materials":21750},"currency":"USD","date":"2026-10-15","directCostCents":318530,"explicitStates":{"completenessState":"PROPOSED: frozen draft has 9 stored lines and no separately assessed tax or contingency.","contingencyTreatment":"PROPOSED: excluded, not assessed.","markupBase":"Direct job cost.","taxTreatment":"PROPOSED: excluded, not assessed."},"exporterVersion":"3","id":"paint-oil-windows-lead/v1","labor":{"coverage":"PROPOSED: labor rows cover only stored Labor cost-type lines; Subcontract rows are the subcontractor's all-in price to the contractor.","rateBasis":"Loaded labor rates for a mid-market residential contractor (wages plus employer burden), median U.S. market; supply-and-install coverage as stated per row."},"license":{"policy":"Clamp permits attributed citation, quotation and reproduction of this published example, including commercial editorial use, contractor project estimating, research, search indexing, and retrieval or caching used to produce attributed answers. This permission does not authorize republication of substantially all Clamp-authored snapshot content as a competing commercial cost-reference collection, whether assembled from one or multiple snapshots. Contact Clamp for that permission. These terms apply only to rights Clamp owns or may license. They do not restrict independent facts, independently developed data, fair use or other statutory rights. Third-party material remains subject to its applicable terms. Attribution should identify Clamp, the scenario/version and its canonical URL. Clamp Snapshot Rights Policy 1.0, working draft subject to counsel review.","redistributionClearance":"All published inputs are Clamp’s internal researched baseline (multi-source AI research synthesized by Clamp); no third-party licensed datasets are incorporated.","reference":"Clamp Snapshot Rights Policy 1.0","version":"Clamp Snapshot Rights Policy 1.0"},"licenseReference":"Clamp Snapshot Rights Policy 1.0","licenseVersion":"Clamp Snapshot Rights Policy 1.0","limitations":["Modeled examples are not bids, completed-job records, or national averages.","Rates are researched baselines with stated windows; local quotes vary.","Typical conditions are assumed.","Permit and inspection fees are excluded; painting rarely needs a permit."],"markupIllustrations":[{"grossMargin":0.23076923076923075,"markup":0.3,"sellingPriceCents":414089},{"grossMargin":0.3333333333333333,"markup":0.5,"sellingPriceCents":477795},{"grossMargin":0.4444444444444445,"markup":0.8,"sellingPriceCents":573354}],"modifierInputsVersion":"95c2687b","rateInputsVersion":"95c2687b","rateObservationWindow":{"end":"2026-10-15","start":"2026-10-06"},"review":{"approvalTimestamp":"","reviewDate":"","reviewer":"Emmanuel Forge","scope":"PROPOSED: scope selection, arithmetic, and provenance mapping; not independent market-rate verification"},"rows":[{"assembly":{"name":"Exterior Painting System + Exterior Shutters: Add, Replace, Remove or Paint","version":"95c2687b"},"componentExtendedCosts":{"laborCents":0,"materialCents":5280,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":4800,"otherCents":0},"costType":"Allowances","id":"exterior-paint-gallon-allowance","name":"Exterior Paint (per gallon)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1.1,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding false, paintable sf 2000, paintable sf includes trim false, coats 2, paint trim false, trim lf 0, door count 0, porch sf 0, soffit sf 0, window sash count 10, railing lf 0, column count 0; Exterior Shutters: Add, Replace, Remove or Paint = 1.1 gallon.","net":1.1,"purchased":1.1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":5280,"trade":"Painting","unit":"gallon","unitPriceCents":4800},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":150000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":15000,"materialCents":0,"otherCents":0},"costType":"Labor","id":"exterior-window-sash-paint-labor","name":"Exterior Window Sash and Frame Paint (per window)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-15","reference":"Private source","visibility":"private"}],"quantity":10,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from window sash count 10 = 10 ea.","net":10,"purchased":10,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":150000,"trade":"Painting","unit":"ea","unitPriceCents":15000},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":12500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":12500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"glazing-paint-return-visit-labor","name":"Return Visit to Paint the Glazing","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-15","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from window reglaze count 10 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":12500,"trade":"Painting","unit":"ea","unitPriceCents":12500},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":0,"materialCents":5250,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":15000,"otherCents":0},"costType":"Materials","id":"paint-sundries-materials","name":"Paint Sundries Materials","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":0.35,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from paint siding false, paintable sf 2000, soffit sf 0, paint trim false, trim lf 0, railing lf 0, window sash count 10, door count 0, porch sf 0 = 0.35 ls.","net":0.35,"purchased":0.35,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":5250,"trade":"Painting","unit":"ls","unitPriceCents":15000},{"assembly":{"name":"Lead-Safe Work Practices (RRP)","version":"95c2687b"},"componentExtendedCosts":{"laborCents":19500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":19500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"rrp-cleaning-verification-labor","name":"Lead-Safe (RRP) Cleaning and Verification, per Work Area","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Lead-Safe Work Practices (RRP) from lead status presumed, disturbed painted sf 40, exterior true, window replacement false, demolition false, work areas 1 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":19500,"trade":"Cleanup & Disposal","unit":"ea","unitPriceCents":19500},{"assembly":{"name":"Lead-Safe Work Practices (RRP)","version":"95c2687b"},"componentExtendedCosts":{"laborCents":42500,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":42500,"materialCents":0,"otherCents":0},"costType":"Labor","id":"rrp-containment-setup-labor","name":"Lead-Safe (RRP) Containment, per Work Area","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Lead-Safe Work Practices (RRP) from lead status presumed, disturbed painted sf 40, exterior true, window replacement false, demolition false, work areas 1 = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":42500,"trade":"Demo & Prep","unit":"ea","unitPriceCents":42500},{"assembly":{"name":"Lead-Safe Work Practices (RRP)","version":"95c2687b"},"componentExtendedCosts":{"laborCents":0,"materialCents":6500,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":6500,"otherCents":0},"costType":"Materials","id":"rrp-waste-handling-materials","name":"Lead-Safe (RRP) Waste Handling, per Job","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-06","reference":"Private source","visibility":"private"}],"quantity":1,"quantityContract":{"deductions":0,"derivation":"Lead-Safe Work Practices (RRP) from lead status presumed, disturbed painted sf 40, exterior true, window replacement false, demolition false = 1 ea.","net":1,"purchased":1,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":6500,"trade":"Restoration","unit":"ea","unitPriceCents":6500},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":0,"materialCents":10000,"otherCents":0},"componentRates":{"laborCents":0,"materialCents":1000,"otherCents":0},"costType":"Materials","id":"window-glazing-materials","name":"Glazing Putty, Points and Primer (per window)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-15","reference":"Private source","visibility":"private"}],"quantity":10,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from window reglaze count 10 = 10 ea.","net":10,"purchased":10,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":10000,"trade":"Painting","unit":"ea","unitPriceCents":1000},{"assembly":{"name":"Exterior Painting System","version":"95c2687b"},"componentExtendedCosts":{"laborCents":67000,"materialCents":0,"otherCents":0},"componentRates":{"laborCents":6700,"materialCents":0,"otherCents":0},"costType":"Labor","id":"window-reglaze-labor","name":"Window Reglazing, Loose Putty (per window)","provenance":[{"class":"internal-researched","evidenceStatus":"baseline evidence","observationDate":"2026-10-15","reference":"Private source","visibility":"private"}],"quantity":10,"quantityContract":{"deductions":0,"derivation":"Exterior Painting System from window reglaze count 10 = 10 ea.","net":10,"purchased":10,"rounding":"Quantity rounded to 0.01 by the published pricer.","waste":0},"totalCents":67000,"trade":"Painting","unit":"ea","unitPriceCents":6700}],"scenario":{"allowanceTreatment":"PROPOSED: finish paint is an allowance at a mid-grade price per gallon; the selected product sets the final cost. Lead-safe containment, cleanup and testing lines are allowances until the containment plan is measured.","assumptions":["Lead is presumed until a test documents otherwise.","One containment setup covers the ten windows.","Use a primer its maker approves over alkyd for the surface; dull glossy paint where the maker requires it."],"baselineConditions":"PROPOSED: ten wood double-hung windows with oil-based paint on a 1940 house, presumed to contain lead.","dimensions":[{"label":"Windows","unit":"count","value":10}],"exclusions":["Storm windows and screens.","Rot repair in sills or sashes.","Full reglazing of every pane."],"finishLevel":"Sashes, frames, sills and casings scraped, reglazed, primed and painted, lead-safe","geographicBasis":"Clamp researched baseline rates, reconciled across three AI systems against a stated mid-market scenario; no specific locality and no measured market median","geography":"No specific locality is selected, and no statistically measured market median is claimed","inclusions":["Pressure washing of all paintable surfaces","Scraping loose or failing paint","Caulking gaps at trim and siding joints","Spot or full primer application per parameter selection","Two-coat paint application to body and trim","Paint and primer material supply","Drop cloths, masking, and protective covering","Lead-safe protocol compliance for pre-1978 homes","Certified lead inspector risk assessment","Containment barrier setup with negative air filtration"],"kind":"Ten Wood Windows, Outside, Reglazed","scope":["Lead-safe exterior containment: plastic 10 ft out, windows and doors closed","Scrape and sand the sashes, frames, sills and casings","Reglaze the loose putty in place","Prime and two coats of exterior paint","A return trip to paint the putty once it skins over (7 to 14 days)"]},"schemaVersion":"1.0","tradeSubtotals":{"Cleanup & Disposal":19500,"Demo & Prep":42500,"Painting":250030,"Restoration":6500},"version":"v1"}
