The questions for the walk before the walls close, in the order you'll walk them: a look back at the site and the pour, then everything behind the drywall, then what locks with the cabinet order.

Walk every room before insulation and drywall, and confirm what was agreed is actually there: blocking, shutoffs, outlets, returns, sound details, network cable and the shower's waterproofing plan. Photograph every wall. Anything still open gets an owner and a date before the walls close, because after that it means cutting drywall.

Site, a look back

  1. From Where does water go on this lot, and how is the foundation protected?

Before the pour, a look back

  1. From What's going under the slab, and has it been checked before the pour?

  2. From What's going under the slab, and has it been checked before the pour?

Before drywall

  1. From Which doors, how wide and how tall, and which way do they swing?

  2. From Has window placement been checked against the furniture and privacy?

  3. From Where is blocking going in, and will it be recorded?

  4. From Where is blocking going in, and will it be recorded?

  5. From Where will clothes, coats, shoes and gear actually live?

  6. From How wide are the stairs, and what are they made of?

  7. From Which flooring materials go in each room, and how will they meet?

  8. From Where are the pipe runs, shutoffs and cleanouts, and can we reach them?

  9. From Where are the pipe runs, shutoffs and cleanouts, and can we reach them?

  10. From Where are the pipe runs, shutoffs and cleanouts, and can we reach them?

  11. From How long will we wait for hot water at the farthest fixture?

  12. From Where are the pipe runs, shutoffs and cleanouts, and can we reach them?

  13. From Which water heater suits how this household uses hot water?

  14. From Where do the washer and dryer go, and what do they need?

  15. From Where do the washer and dryer go, and what do they need?

  16. From Do the outlets work with our furniture and how we'll live here?

  17. From Which loads share circuits, and what can the panel carry later?

  18. From What gets roughed in now for later: solar, an EV charger, a future bath?

  19. From Where are the lights and switches, and where will shadows fall?

  20. From How was the heating and cooling sized?

  21. From How does air get back from each bedroom with the door shut?

  22. From How many zones and thermostats does this house need?

  23. From How does the house get fresh air, and how is humidity controlled?

  24. From Is the kitchen layout settled before rough-in and the cabinet order?

  25. From Is the kitchen layout settled before rough-in and the cabinet order?

  26. From Where does heat escape in your builds, and how is it sealed?

  27. From Which walls need sound control, and where will plumbing noise travel?

  28. From Which rooms get wired, and where will there be routes for later?

  29. From Which rooms get wired, and where will there be routes for later?

  30. From Can the attic be used for storage, and what access does that need?

  31. From Is there a fireplace or feature wall, and what feeds it?

  32. From Which waterproofing system is in the shower, and when is it tested?

  33. From What's still open before the walls close?

  34. From What drywall finish are we getting, and what gets fixed before it goes up?

  35. From Will what's behind the walls be photographed and saved?

Before the cabinet order

  1. From Is the kitchen layout settled before rough-in and the cabinet order?

Your checks and notes stay in this browser on this device.

If this were your house, what would you change?

Sources

Rules on contracts, deposits, permits and building codes vary by state and town. Where an answer depends on where you live, the page says to ask what applies there.

Related