Project cost · modeled example

Dishwasher Leak Floor Repair Cost: 240 Sq Ft of LVP, Itemized (2026 Baseline)

A dishwasher leak that ruined 45 sq ft of engineered wood, fixed by replacing 240 sq ft of continuous floor with LVP and resetting the homeowner's new dishwasher, itemized with crew hours.

Direct answer: Replacing a leak-damaged kitchen floor and resetting the dishwasher has a direct job cost of $3,385 for this repair in this example. At illustrative markups of 30% to 100%, that is a selling price of about $4,401 to $6,771. Direct job cost is labor and materials only, with no contractor overhead or profit, and is not a price: no contractor performs work at job cost. Permit and inspection fees are not included.
Clamp's Generate from description screen with the floor repair described in plain words

Describe it

The estimate for the floor repair in Clamp's builder: total $3,384.05, grouped into appliances, carpentry, demo and prep, and flooring

Every line, by trade

The job in the Clamp app: described in plain words, then the draft at $3,384 job cost, every line grouped by trade. Sample data.

The job at a glance

One build, fully itemized, with crew hours.

BuildJob costLaborCrew hoursMaterialsIllustrative selling price
A. 240 sq ft of LVP, dishwasher reset$3,385$1,79432 to 48 h$1,301$4,401 to
$6,771

Dump fees and other costs ($290) are the same in every build and included in the job cost. Materials include allowances. Illustrative selling price is the job cost at a 30% to 100% markup; your price depends on your own overhead and profit. Labor hours are a planning range and include setup, daily cleanup and material runs; they are never a charge to the customer. Permit and inspection fees are not included; requirements vary by jurisdiction.

The build in detail

A. 240 sq ft of LVP, dishwasher reset: $3,385

The old dishwasher comes out and the floor underneath is inspected; 240 sq ft of engineered wood is removed through the kitchen and breakfast area; new LVP goes down over underlayment; base molding is reset and the homeowner's new dishwasher goes in. Labor is $1,794 of the $3,385 job cost, or 53.0%. It is about 32 to 48 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Demo & Prep9 to 20 h$516$671$774$1,032
Plumbing2 to 4 h$400$520$600$800
Carpentry5 to 11 h$338$439$507$676
Flooring6 to 13 h$540$702$810$1,080
Setup, cleanup and material runs2 to 8 hin the prices
All labor32 to 48 h$1,794$2,332$2,691$3,588

Every line item

Labor $1,794 + materials and allowances $1,301 + dump fees and other $290 = $3,385 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Demo & Prep
Demo Consumables and Supplies1ls$0$125$125
Hardwood Floor Removal240sf9 to 20 h$504$0$504
Haul-Off Per Load1ea$0$0$225
Floor Protection Setup Labor240sfunder 1 h$12$0$12
Demo & Prep subtotal9 to 20 h$866
Demo & Prep subtotal9 to 20 h$866
Plumbing
Dishwasher Install Labor1ea1 to 3 h$275$0$275
Existing Dishwasher Removal Labor1eaunder 1 h$125$0$125
Plumbing subtotal2 to 4 h$400
Plumbing subtotal2 to 4 h$400
Carpentry
Baseboard Remove and Reinstall Labor81lf4 to 10 h$263$0$263
Door Threshold Transition Labor1eachunder 1 h$75$0$75
Carpentry subtotal5 to 11 h$338
Carpentry subtotal5 to 11 h$338
Flooring
Floor Transition MaterialsLabor on: Door Threshold Transition Labor1ea$0$35$35
Floor Underlayment Materials240sf$0$132$132
Flooring Install Consumables1ea$0$85$85
LVP/LVT Install240sf6 to 13 h$540$0$540
LVP/LVT Material AllowanceLabor on: LVP/LVT Install264sf$0$924$924
Flooring subtotal6 to 13 h$1,716
Flooring subtotal6 to 13 h$1,716
Appliances
Appliance Haul-Away and Recycling1ea$0$0$65
Appliances subtotal$65
Appliances subtotal$65
DIRECT JOB COST32 to 48 h$3,385
DIRECT JOB COST32 to 48 h$3,385

Methodology & reproducibility

One reviewed snapshot for this build. The build is frozen from its own estimate run and priced by the published pricer.

Direct cost equals the sum of each row’s rounded quantity × (labor + material + other). Amounts are shown in whole dollars; every column adds to its total.

Scope selection, prose accuracy, arithmetic and provenance mapping reviewed; not independent market-rate verification.

Questions

Why replace 240 sq ft when 45 sq ft is damaged?

The floor runs continuously into the breakfast area, so a patch would show. Replacing the whole run to a natural break is what keeps it from looking repaired.

What can push this job higher?

A soft subfloor once the flooring is up, which is a separate line when it is found; mold; or cabinets that sit on the old floor and have to be worked around.

Is the markup on top of this?

Yes. Direct job cost is what the repair costs a contractor to perform. The markup table shows what it sells for at illustrative markups of 30% to 100%.