Project cost · modeled example · 7 builds

Cost to Drywall a New House: 7 Jobs, Hang and Finish (2026 Baseline)

Seven new-construction drywall jobs priced line by line, from a 1,200 sq ft ranch to a 3,500 sq ft custom home with a vault and Level 5, plus a textured house, a two-story foyer, a garage and a basement. Every line itemized, with crew hours.

Direct answer: Drywall for a new house, hung, taped and finished, has a direct job cost of $7,014 for a new 1,200 sq ft ranch up to $25,776 for a 3,500 sq ft custom home. At illustrative markups of 30% to 100%, that is a selling price of about $9,118 to $14,028 for the first and $33,509 to $51,552 for the second. Direct job cost is labor and materials only, with no contractor overhead or profit, and is not a price: no contractor performs work at job cost. Permit and inspection fees are not included.

Seven builds, side by side

Seven jobs on the same researched rates: four houses from a 1,200 sq ft ranch to a 3,500 sq ft custom home, a textured house, an attached garage two ways and a basement.

BuildJob costLaborCrew hoursMaterialsIllustrative selling price
A. 1,200 sq ft ranch, Level 4$7,014$3,78677 to 118 h$2,853$9,118 to
$14,028
B. 2,000 sq ft ranch, textured$15,064$9,097193 to 274 h$5,592$19,584 to
$30,129
C. 2,600 sq ft two-story$17,171$9,180187 to 284 h$6,786$22,322 to
$34,342
D. 3,500 sq ft custom home$25,776$14,341297 to 440 h$10,330$33,509 to
$51,552
E. Garage, fire-taped$2,209$94719 to 29 h$887$2,872 to
$4,419
F. Garage, finished$2,728$1,39428 to 43 h$959$3,546 to
$5,456
G. 1,000 sq ft basement$5,160$2,58553 to 80 h$2,100$6,707 to
$10,319

Materials include allowances. Illustrative selling price is the job cost at a 30% to 100% markup; your price depends on your own overhead and profit. Labor hours are a planning range and include setup, daily cleanup and material runs; they are never a charge to the customer. Permit and inspection fees are not included; requirements vary by jurisdiction.

Which price is closer to yours?

  • Low-Overhead, +30%: A handyman or owner-operator who does the work with a small crew and no office. Usually the lowest quote. The owner handles scheduling, questions and callbacks around the work itself.
  • Established, +50%: A remodeling company with a crew, an office, insurance and someone to answer the phone. Close to the average remodeler's overhead in the National Association of Home Builders cost-of-doing-business survey.
  • Full-Service, +100%: A design-build firm with designers, a salesperson and a project manager who runs the job. The extra pays for planning, coordination and one point of contact from design to final inspection.

Higher markup means more business behind the job, not by itself better work, and a lower markup is not by itself a better deal. For contractors: how each markup splits into overhead and profit is in the overhead categories guide.

Each build in detail

A. 1,200 sq ft ranch, Level 4: $7,014

8 ft ceilings, 4,200 sq ft of board hung and finished smooth, one bath of moisture-resistant board. Labor is $3,786 of the $7,014 job cost, or 54.0%. It is about 77 to 118 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Drywall65 to 104 h$3,786$4,922$5,679$7,572
Setup, cleanup and material runs6 to 20 hin the prices
All labor77 to 118 h$3,786$4,922$5,679$7,572

Every line item

Labor $3,786 + materials and allowances $2,853 + dump fees and other $375 = $7,014 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Demo & Prep
Haul-Off Per Load1ea$0$0$225
Demo & Prep subtotal$225
Demo & Prep subtotal$225
Electrical
Drywall Board, 1/2 in Lightweight 4x12 (per sf)4400sf$0$2,288$2,288
Electrical subtotal$2,288
Electrical subtotal$2,288
Drywall
Drywall Compound, Tape, Screws and Bead (per sf of board)4200sf$0$420$420
Drywall Delivery and Stocking (per house)1ea$0$0$150
Drywall Taping and Finishing, Level 4 (per sf of board)4200sf30 to 63 h$2,058$0$2,058
New-Construction Drywall Hang, Ceilings (per sf of board)1200sf9 to 20 h$648$0$648
New-Construction Drywall Hang, Walls (per sf of board)3000sf15 to 33 h$1,080$0$1,080
Mold-Resistant Drywall Board, 1/2 in 4x12 (per sf)220sf$0$145$145
Drywall subtotal65 to 104 h$4,501
Drywall subtotal65 to 104 h$4,501
DIRECT JOB COST77 to 118 h$7,014
DIRECT JOB COST77 to 118 h$7,014

B. 2,000 sq ft ranch, textured: $15,064

9 ft ceilings, Level 4 under knockdown ceilings and orange-peel walls. Labor is $9,097 of the $15,064 job cost, or 60.4%. It is about 193 to 274 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Drywall166 to 240 h$9,097$11,826$13,646$18,194
Setup, cleanup and material runs15 to 46 hin the prices
All labor193 to 274 h$9,097$11,826$13,646$18,194

Every line item

Labor $9,097 + materials and allowances $5,592 + dump fees and other $375 = $15,064 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Demo & Prep
Haul-Off Per Load1ea$0$0$225
Demo & Prep subtotal$225
Demo & Prep subtotal$225
Electrical
Drywall Board, 1/2 in Lightweight 4x12 (per sf)8404sf$0$4,370$4,370
Electrical subtotal$4,370
Electrical subtotal$4,370
Drywall
Drywall Compound, Tape, Screws and Bead (per sf of board)7640sf$0$764$764
Drywall Delivery and Stocking (per house)1ea$0$0$150
Drywall Taping and Finishing, Level 4 (per sf of board)7640sf54 to 114 h$3,744$0$3,744
New-Construction Drywall Hang, Ceilings (per sf of board)2000sf15 to 33 h$1,080$0$1,080
New-Construction Drywall Hang, Walls (per sf of board)5640sf29 to 61 h$2,030$0$2,030
Knockdown Texture (per sf)2000sf10 to 22 h$720$0$720
Drywall Texture Material (per sf)7640sf$0$458$458
Orange Peel Texture (per sf)5640sf22 to 46 h$1,523$0$1,523
Drywall subtotal166 to 240 h$10,469
Drywall subtotal166 to 240 h$10,469
DIRECT JOB COST193 to 274 h$15,064
DIRECT JOB COST193 to 274 h$15,064

C. 2,600 sq ft two-story: $17,171

Two floors, an 18 ft foyer and open stairwell with a lift, boomed upstairs, Level 4. Labor is $9,180 of the $17,171 job cost, or 53.5%. It is about 187 to 284 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Drywall159 to 251 h$9,180$11,934$13,770$18,360
Setup, cleanup and material runs15 to 47 hin the prices
All labor187 to 284 h$9,180$11,934$13,770$18,360

Every line item

Labor $9,180 + materials and allowances $6,786 + dump fees and other $1,205 = $17,171 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Demo & Prep
Haul-Off Per Load2ea$0$0$450
Demo & Prep subtotal$450
Demo & Prep subtotal$450
Electrical
Drywall Board, 1/2 in Lightweight 4x12 (per sf)11107.8sf$0$5,776$5,776
Electrical subtotal$5,776
Electrical subtotal$5,776
Drywall
Drywall Compound, Tape, Screws and Bead (per sf of board)10098sf$0$1,010$1,010
Drywall Delivery and Stocking (per house)1ea$0$0$150
Drywall Taping and Finishing, Level 4 (per sf of board)10098sf72 to 150 h$4,948$0$4,948
New-Construction Drywall Hang, Ceilings (per sf of board)2600sf20 to 43 h$1,404$0$1,404
New-Construction Drywall Hang, Walls (per sf of board)7498sf38 to 81 h$2,699$0$2,699
High Work Premium, Over 10 ft (per sf of affected board)678sf1 to 4 h$129$0$129
Drywall subtotal159 to 251 h$10,340
Drywall subtotal159 to 251 h$10,340
Flooring
Drywall Stocking, Upper Floor or Basement (per house)1ea$0$0$100
Flooring subtotal$100
Flooring subtotal$100
Equipment
Scissor Lift and Scaffold Rental (per house)1ea$0$0$505
Equipment subtotal$505
Equipment subtotal$505
DIRECT JOB COST187 to 284 h$17,171
DIRECT JOB COST187 to 284 h$17,171

D. 3,500 sq ft custom home: $25,776

10 ft ceilings, an 18 ft vault, two trays and three arches, Level 5 in the main rooms. Labor is $14,341 of the $25,776 job cost, or 55.6%. It is about 297 to 440 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Drywall253 to 388 h$14,341$18,643$21,512$28,682
Setup, cleanup and material runs24 to 73 hin the prices
All labor297 to 440 h$14,341$18,643$21,512$28,682

Every line item

Labor $14,341 + materials and allowances $10,330 + dump fees and other $1,105 = $25,776 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Demo & Prep
Haul-Off Per Load2ea$0$0$450
Demo & Prep subtotal$450
Demo & Prep subtotal$450
Electrical
Drywall Board, 1/2 in Lightweight 4x12 (per sf)16566sf$0$8,614$8,614
Electrical subtotal$8,614
Electrical subtotal$8,614
Drywall
Drywall Compound, Tape, Screws and Bead (per sf of board)15060sf$0$1,506$1,506
Drywall Delivery and Stocking (per house)1ea$0$0$150
Drywall Taping and Finishing, Level 4 (per sf of board)14785sf105 to 220 h$7,245$0$7,245
New-Construction Drywall Hang, Ceilings (per sf of board)3635sf28 to 59 h$1,963$0$1,963
New-Construction Drywall Hang, Walls (per sf of board)11150sf57 to 121 h$4,014$0$4,014
High Work Premium, Over 10 ft (per sf of affected board)775sf2 to 5 h$147$0$147
Level 5 Skim Coat or Spray Surfacer (per sf of affected board)3000sf7 to 17 h$540$0$540
Drywall Level 5 Surfacer or Skim Compound (per sf of affected board)3000sf$0$210$210
Arches, Trays and Soffits, Hung and Finished (per sf of surface)275sf6 to 13 h$432$0$432
Drywall subtotal253 to 388 h$16,207
Drywall subtotal253 to 388 h$16,207
Equipment
Scissor Lift and Scaffold Rental (per house)1ea$0$0$505
Equipment subtotal$505
Equipment subtotal$505
DIRECT JOB COST297 to 440 h$25,776
DIRECT JOB COST297 to 440 h$25,776

E. Garage, fire-taped: $2,209

24 by 24, Type X ceiling and house wall under a bonus room, fire-taped only. Labor is $947 of the $2,209 job cost, or 42.9%. It is about 19 to 29 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Drywall17 to 26 h$947$1,231$1,421$1,894
Setup, cleanup and material runs1 to 5 hin the prices
All labor19 to 29 h$947$1,231$1,421$1,894

Every line item

Labor $947 + materials and allowances $887 + dump fees and other $375 = $2,209 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Demo & Prep
Haul-Off Per Load1ea$0$0$225
Demo & Prep subtotal$225
Demo & Prep subtotal$225
Electrical
Drywall Board, 1/2 in Lightweight 4x12 (per sf)712.8sf$0$371$371
Electrical subtotal$371
Electrical subtotal$371
Drywall
Drywall Compound, Tape, Screws and Bead (per sf of board)1440sf$0$72$72
Drywall Delivery and Stocking (per house)1ea$0$0$150
Drywall Fire-Taping (per sf of board)1440sf3 to 8 h$259$0$259
New-Construction Drywall Hang, Walls (per sf of board)648sf3 to 7 h$233$0$233
Type X Drywall Board, 5/8 in 4x12 (per sf)871.2sf$0$444$444
Type X Drywall Hang, Ceilings (per sf of board)576sf5 to 12 h$369$0$369
Type X Drywall Hang, Walls (per sf of board)216sf1 to 3 h$86$0$86
Drywall subtotal17 to 26 h$1,613
Drywall subtotal17 to 26 h$1,613
DIRECT JOB COST19 to 29 h$2,209
DIRECT JOB COST19 to 29 h$2,209

F. Garage, finished: $2,728

The same garage finished smooth to Level 4. Labor is $1,394 of the $2,728 job cost, or 51.1%. It is about 28 to 43 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Drywall24 to 38 h$1,394$1,812$2,091$2,788
Setup, cleanup and material runs2 to 8 hin the prices
All labor28 to 43 h$1,394$1,812$2,091$2,788

Every line item

Labor $1,394 + materials and allowances $959 + dump fees and other $375 = $2,728 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Demo & Prep
Haul-Off Per Load1ea$0$0$225
Demo & Prep subtotal$225
Demo & Prep subtotal$225
Electrical
Drywall Board, 1/2 in Lightweight 4x12 (per sf)712.8sf$0$371$371
Electrical subtotal$371
Electrical subtotal$371
Drywall
Drywall Compound, Tape, Screws and Bead (per sf of board)1440sf$0$144$144
Drywall Delivery and Stocking (per house)1ea$0$0$150
Drywall Taping and Finishing, Level 4 (per sf of board)1440sf10 to 22 h$706$0$706
New-Construction Drywall Hang, Walls (per sf of board)648sf3 to 7 h$233$0$233
Type X Drywall Board, 5/8 in 4x12 (per sf)871.2sf$0$444$444
Type X Drywall Hang, Ceilings (per sf of board)576sf5 to 12 h$369$0$369
Type X Drywall Hang, Walls (per sf of board)216sf1 to 3 h$86$0$86
Drywall subtotal24 to 38 h$2,132
Drywall subtotal24 to 38 h$2,132
DIRECT JOB COST28 to 43 h$2,728
DIRECT JOB COST28 to 43 h$2,728

G. 1,000 sq ft basement: $5,160

Mold-resistant walls, 40 ft of partitions, a beam soffit, Level 4. Labor is $2,585 of the $5,160 job cost, or 50.1%. It is about 53 to 80 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Drywall45 to 70 h$2,585$3,361$3,878$5,170
Setup, cleanup and material runs4 to 13 hin the prices
All labor53 to 80 h$2,585$3,361$3,878$5,170

Every line item

Labor $2,585 + materials and allowances $2,100 + dump fees and other $475 = $5,160 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Demo & Prep
Haul-Off Per Load1ea$0$0$225
Demo & Prep subtotal$225
Demo & Prep subtotal$225
Electrical
Drywall Board, 1/2 in Lightweight 4x12 (per sf)1166sf$0$606$606
Electrical subtotal$606
Electrical subtotal$606
Drywall
Drywall Compound, Tape, Screws and Bead (per sf of board)2740sf$0$274$274
Drywall Delivery and Stocking (per house)1ea$0$0$150
Drywall Taping and Finishing, Level 4 (per sf of board)2620sf18 to 39 h$1,284$0$1,284
New-Construction Drywall Hang, Ceilings (per sf of board)940sf7 to 16 h$508$0$508
New-Construction Drywall Hang, Walls (per sf of board)1680sf8 to 19 h$605$0$605
Mold-Resistant Drywall Board, 1/2 in 4x12 (per sf)1848sf$0$1,220$1,220
Arches, Trays and Soffits, Hung and Finished (per sf of surface)120sf2 to 6 h$188$0$188
Drywall subtotal45 to 70 h$4,229
Drywall subtotal45 to 70 h$4,229
Flooring
Drywall Stocking, Upper Floor or Basement (per house)1ea$0$0$100
Flooring subtotal$100
Flooring subtotal$100
DIRECT JOB COST53 to 80 h$5,160
DIRECT JOB COST53 to 80 h$5,160

Methodology & reproducibility

7 snapshots, one per build. Each build is frozen from its own estimate run with the same old work, system type and takeoff pinned, so the builds differ only in what is being built.

Direct cost equals the sum of each row’s rounded quantity × (labor + material + other). Amounts are shown in whole dollars; every column adds to its total.

Scope selection, prose accuracy, arithmetic and provenance mapping reviewed; not independent market-rate verification.

Questions

How much does it cost to drywall a new house?

Hung, taped and finished smooth to Level 4, a 1,200 sq ft ranch is $7,014 in job cost, $9,118 to $14,028 from a contractor, about $5.85 per sq ft of house before markup. A 3,500 sq ft custom home with a vault, trays and Level 5 in the main rooms is $25,776. NAHB's 2024 builder survey puts drywall at $13,962 on an average 2,647 sq ft house, about $5.27 per sq ft of floor.

How much drywall does a house need?

About 3.5 sq ft of board per sq ft of floor with 8 ft ceilings and 3.82 with 9 ft ceilings, figured story by story; 10 ft ceilings run about 4.14. A 1,200 sq ft ranch takes about 4,200 sq ft of board, roughly 88 sheets of 4x12 before the cut allowance. Vaults, two-story foyers and the garage are measured on top.

How much extra is a smooth wall finish?

On a new house smooth is the cheaper choice. A Level 4 smooth finish, ready for flat paint, is the base in every build here. Texture is added work: knockdown ceilings and orange-peel walls add $2,701 in job cost to the 2,000 sq ft ranch ($15,064 in all), about $0.35 per sq ft of board. Level 3 under heavy texture saves only about $0.06 per sq ft.

How much extra is a Level 5 finish?

Level 5 is a skim coat or sprayed surfacer over Level 4, for gloss paint or rooms with raking light. It adds about $0.25 per sq ft of board in job cost. On the custom home's great room and kitchen (3,000 sq ft of board) that is $750; across a whole 2,000 sq ft house (7,640 sq ft of board) it would be about $1,910, or $2,483 to $3,820 from a contractor.

How much extra is a Venetian plaster finish?

Venetian plaster is a decorative finish troweled over finished drywall, so it is on top of the drywall, not instead of it. Angi puts it at $10 to $25 per sq ft of wall installed: about $12 to $15 undyed and about $25 colored. The four walls of a 12 by 14 room with 8 ft ceilings, about 416 sq ft, would be roughly $4,200 to $10,400. Most houses use it on one accent wall or room.

What does a two-story foyer or a vaulted ceiling add?

Work more than 10 ft up is slower and needs a scissor lift and scaffold. The 2,600 sq ft two-story with an 18 ft foyer and open stairwell is $17,171 in job cost, including about $129 of high-work labor and $505 for a week of lift and scaffold.

What does it cost to drywall a garage?

For the 24 by 24 attached garage with a bonus room above: 5/8 in Type X on the ceiling and the house wall, fire-taped only, is $2,209 in job cost; finished smooth to Level 4 it is $2,728. The code requires 5/8 in Type X on a garage ceiling under a room (screwed at 6 in), and at least 1/2 in board on the wall shared with the house.

What about a basement in a new house?

The 1,000 sq ft basement with mold-resistant board on the foundation walls and partitions, a beam soffit and a Level 4 finish is $5,160 in job cost. Mold-resistant board resists mold; it does not make a wet basement dry.

Is hanging or finishing the bigger cost?

Finishing. On the 1,200 sq ft ranch, hanging the walls and ceilings is about $1,728 and taping and finishing to Level 4 about $2,058. Board and supplies are about $2,850.

Is the markup on top of these numbers?

Yes. Direct job cost is what the work costs a drywall crew to do. The markup table shows what it sells for at illustrative markups of 30% to 100%, from a low-overhead owner-operator to a full-service firm.

Related

Sources & provenance

  1. Cost of Constructing a Home, 2024 NAHB (research)
  2. How Much Does Drywall Installation Cost? HomeGuide (research)
  3. Estimating Materials (drywall) Fine Homebuilding (research)
  4. National Home Improvement Estimator 2018 (preview) Craftsman Book Company (book)
  5. Gypsum Board Finish Levels National Gypsum (research)
  6. 2021 International Residential Code, Chapter 3 International Code Council (official source)
  7. How Much Does It Cost to Apply Venetian Plaster? Angi (research)
  8. 1,200 sq ft ranch, Level 4 reviewed snapshot Clamp Research
  9. 2,000 sq ft ranch, textured reviewed snapshot Clamp Research
  10. 2,600 sq ft two-story reviewed snapshot Clamp Research
  11. 3,500 sq ft custom home reviewed snapshot Clamp Research
  12. Garage, fire-taped reviewed snapshot Clamp Research
  13. Garage, finished reviewed snapshot Clamp Research
  14. 1,000 sq ft basement reviewed snapshot Clamp Research
Changes: Oct 15, 2026: Initial publication: seven new-construction drywall jobs frozen from estimate runs on the October 2026 estimator, with NAHB builder costs and published installed prices.