Project cost · modeled example

8x10 Mudroom Addition Cost: Fully Itemized (2026 Baseline)

An 80 sf heated mudroom on a new foundation, framed, roofed, sided, wired, heated and finished with a built-in bench, every line itemized with crew hours.

Direct answer: Adding an 8x10 mudroom on a new foundation has a direct job cost of $35,588 for this 80 sf heated mudroom in this example. At illustrative markups of 30% to 100%, that is a selling price of about $46,265 to $71,177. Direct job cost is labor and materials only, with no contractor overhead or profit, and is not a price: no contractor performs work at job cost. Permit and inspection fees are not included.
Clamp's Generate from description screen with the 8x10 mudroom described in plain words

Describe it

The mudroom estimate in Clamp's builder grouped by trade, carpentry first

Every line, by trade

The mudroom in the Clamp app: described the way you would say it, then every line grouped by trade in the estimate builder. Sample data.

The job at a glance

One build, fully itemized, with crew hours.

BuildJob costLaborCrew hoursMaterialsIllustrative selling price
A. 8x10 mudroom on a new foundation$35,588$19,297253 to 307 h$9,576$46,265 to
$71,177

Dump fees and other costs ($6,715) are the same in every build and included in the job cost. Materials include allowances. Illustrative selling price is the job cost at a 30% to 100% markup; your price depends on your own overhead and profit. Labor hours are a planning range and include setup, daily cleanup and material runs; they are never a charge to the customer. Permit and inspection fees are not included; requirements vary by jurisdiction.

The build in detail

A. 8x10 mudroom on a new foundation: $35,588

The patio section comes out, a frost footing goes in, and the room is framed, roofed into the existing wall, sided, insulated, wired, heated off the existing ductwork and finished with LVP and a built-in bench. Labor is $19,297 of the $35,588 job cost, or 54.2%. It is about 253 to 307 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLow-Overhead×1.30Established×1.50Full-Service×2.00
Permits & PM50 to 81 h$5,165$6,715$7,748$10,330
Demo & Prep4 to 8 h$364$473$546$728
Masonry15 to 28 h$1,838$2,389$2,757$3,676
Electrical13 to 20 h$2,060$2,678$3,090$4,120
HVAC16 to 23 h$1,853$2,409$2,780$3,706
Insulation2 to 5 h$273$355$410$546
Drywall12 to 22 h$824$1,071$1,236$1,648
Carpentry51 to 67 h$4,340$5,642$6,510$8,680
Flooring2 to 5 h$180$234$270$360
Painting12 to 17 h$975$1,268$1,462$1,950
Exterior5 to 10 h$582$757$873$1,164
Roofing6 to 9 h$665$864$997$1,330
Landscaping1 to 4 h$178$231$267$356
Setup, cleanup and material runs18 to 55 hin the prices
All labor253 to 307 h$19,297$25,086$28,946$38,594

Every line item

Labor $19,297 + materials and allowances $9,576 + dump fees and other $6,715 = $35,588 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Permits & PM
Daily Cleanup & Staging7ea15 to 34 h$1,540$0$1,540
Engineering Review Allowance1ea$0$0$850
Final Cleanup & Walkthrough1ea3 to 9 h$300$0$300
Jobsite Supervision Labor35hr22 to 48 h$3,325$0$3,325
Permits & PM subtotal50 to 81 h$6,015
Permits & PM subtotal50 to 81 h$6,015
Demo & Prep
Dumpster Rental Weekly1week$0$0$550
Exterior Demolition Labor72sf1 to 2 h$115$0$115
Floor Protection Setup Labor80sfunder 1 h$4$0$4
Site Protection, Minimal (per job)1eaunder 1 h$45$0$45
Site Protection Setup Labor0.5day2 to 6 h$200$0$200
Demo & Prep subtotal4 to 8 h$914
Demo & Prep subtotal4 to 8 h$914
Sitework
Excavation Spoils Export (Per Cubic Yard)6cubic_yard$0$0$252
Foundation Excavation (Machine, Per Cubic Yard)10cubic_yard$0$0$520
Portable Toilet Rental (per month)2month$0$0$450
Sitework subtotal$1,222
Sitework subtotal$1,222
Masonry
Concrete Footing Install Labor27lf4 to 9 h$297$0$297
Concrete Footing MaterialsLabor on: Concrete Footing Install Labor29.7lf$0$431$431
Foundation Pour Labor2.68cubic_yard9 to 21 h$1,541$0$1,541
Foundation Pour MaterialsLabor on: Foundation Pour Labor2.95cubic_yard$0$841$841
Masonry subtotal15 to 28 h$3,110
Masonry subtotal15 to 28 h$3,110
Electrical
New Branch Circuit (labor)2ea3 to 9 h$850$0$850
Dedicated Circuit Breaker AllowanceLabor on: New Branch Circuit (labor)2ea$0$48$48
Electrical Box and Device MaterialsLabor on: Electrical Rough-In Per Device7ea$0$60$60
Electrical Rough-In Per Device8ea3 to 7 h$440$0$440
Light Fixture AllowanceLabor on: Light Fixture Install1ea$0$150$150
Light Fixture Install1ea1 to 2 h$125$0$125
Outlet/Switch Install6ea1 to 4 h$390$0$390
Outlet Unit AllowanceLabor on: Outlet/Switch Install4ea$0$11$11
Recessed Can AllowanceLabor on: Recessed Light, New Work (open ceiling)2ea$0$34$34
Recessed Light, New Work (open ceiling)2ea1 to 2 h$170$0$170
Romex Wire MaterialsLabor on: Electrical Rough-In Per Device172.5lf$0$138$138
Smoke / CO Detector AllowanceLabor on: Smoke/CO Detector Install1ea$0$55$55
Smoke/CO Detector Install1eaunder 1 h$85$0$85
Switch Unit AllowanceLabor on: Outlet/Switch Install2ea$0$14$14
Electrical subtotal13 to 20 h$2,570
Electrical subtotal13 to 20 h$2,570
HVAC
Ductwork Install30lf3 to 9 h$345$0$345
Ductwork MaterialsLabor on: Ductwork Install42lf$0$326$326
Ductwork Modification10lf3 to 7 h$420$0$420
HVAC Commissioning and Balance1ea1 to 5 h$550$0$550
HVAC Load Calculation Labor1ea2 to 6 h$350$0$350
Register Boot AllowanceLabor on: Ductwork Install3ea$0$105$105
Register and Grille Install3eaunder 1 h$60$0$60
Return Duct Install Labor15lf1 to 2 h$128$0$128
Return Duct MaterialsLabor on: Return Duct Install Labor15lf$0$143$143
HVAC subtotal16 to 23 h$2,427
HVAC subtotal16 to 23 h$2,427
Insulation
Air Sealing ConsumablesLabor on: Attic Floor Air Sealing (per sf of attic)1ls$0$450$450
Attic Floor Air Sealing (per sf of attic)80sf1 to 3 h$76$0$76
Attic Blown Insulation, Installed (per sf at R-49)80sf$0$0$132
Floor Insulation from Below, Installed (per sf)80sf$0$0$207
Eave Ventilation Baffle (per rafter bay)9eaunder 1 h$72$0$72
Insulation Dam Install Labor1eaunder 1 h$82$0$82
Insulation Dam MaterialsLabor on: Insulation Dam Install Labor1ea$0$75$75
Rim and Sill Air Sealing Labor36lfunder 1 h$43$0$43
Vapor Retarder (per sf)80sf$0$0$68
Wall Batt Insulation, Installed (per sf)214.66sf$0$0$311
Insulation subtotal2 to 5 h$1,516
Insulation subtotal2 to 5 h$1,516
Drywall
Drywall Finish Labor366.22sf7 to 15 h$549$0$549
Drywall Hang Labor366.22sf3 to 8 h$275$0$275
Drywall Sheets MaterialsLabor on: Drywall Hang Labor402.84sf$0$302$302
Drywall subtotal12 to 22 h$1,126
Drywall subtotal12 to 22 h$1,126
Carpentry
Floor System Framing Labor80sf3 to 7 h$360$0$360
Floor System Framing MaterialsLabor on: Floor System Framing Labor84sf$0$378$378
Custom Built-In Carpentry6lf8 to 19 h$855$0$855
Door Lock Hardware AllowanceLabor on: Exterior Door Install1each$0$150$150
Door/Window Unit AllowanceLabor on: Exterior Door Install1ea$0$950$950
Exterior Door Install1ea6 to 14 h$675$0$675
Exterior Trim Install18lf1 to 2 h$81$0$81
Exterior Wall Framing MaterialsLabor on: Stud Wall Framing Install28.17lf$0$380$380
Roof Rafter/Truss Framing0.92square2 to 5 h$391$0$391
Sheathing Install306.66sf2 to 5 h$383$0$383
Stud Wall Framing Install26.83lf3 to 8 h$443$0$443
Hook Strip Install Labor4lfunder 1 h$34$0$34
Hook Strip MaterialsLabor on: Hook Strip Install Labor4lf$0$26$26
Door Threshold Transition Labor1eachunder 1 h$75$0$75
Open Shelving and Bench MaterialsLabor on: Custom Built-In Carpentry6.6lf$0$224$224
Permit Drawing Set (Design and Drafting)1ea$0$0$3,375
Roof Framing MaterialsLabor on: Roof Rafter/Truss Framing0.97square$0$504$504
Soffit and Fascia Install27lf2 to 6 h$229$0$229
Baseboard and Casing Install36lf1 to 2 h$153$0$153
Trim MaterialsLabor on: Baseboard and Casing Install39.6lf$0$83$83
Wall Sheathing MaterialsLabor on: Sheathing Install236.13sf$0$224$224
Window Caulk & Flash MaterialsLabor on: Window Install2each$0$96$96
Window and Door Install ConsumablesLabor on: Exterior Door Install1ea$0$48$48
Window Exterior Trim MaterialsLabor on: Exterior Trim Install18lf$0$58$58
Window Install2ea5 to 11 h$481$0$481
Window Interior Trim Install Labor2each1 to 4 h$180$0$180
Window Interior Trim MaterialsLabor on: Window Interior Trim Install Labor34lf$0$110$110
Window Unit AllowanceLabor on: Window Install2each$0$575$575
Carpentry subtotal51 to 67 h$11,521
Carpentry subtotal51 to 67 h$11,521
Flooring
Floor Transition MaterialsLabor on: Door Threshold Transition Labor1ea$0$35$35
Floor Underlayment Materials80sf$0$44$44
Flooring Install Consumables0.4ea$0$34$34
LVP/LVT Install80sf2 to 5 h$180$0$180
LVP/LVT Material AllowanceLabor on: LVP/LVT Install88sf$0$308$308
Flooring subtotal2 to 5 h$601
Flooring subtotal2 to 5 h$601
Painting
Paint Finish on New Built-ins6lf2 to 6 h$288$0$288
Interior Ceiling Paint Apply Labor80sfunder 1 h$77$0$77
Interior Paint Apply Labor286.22sf2 to 6 h$206$0$206
Paint Hardware Removal Labor6eaunder 1 h$45$0$45
Paint Masking Setup Labor286.22sfunder 1 h$11$0$11
Premium Paint AllowanceLabor on: Interior Paint Apply Labor2.58gallon$0$124$124
Paint Prep Labor366.22sf1 to 3 h$81$0$81
Paint Primer Application Labor366.22sf1 to 2 h$110$0$110
Paint and Primer MaterialsLabor on: Paint Primer Application Labor2.6gallon$0$83$83
Paint Sundries Materials1ls$0$150$150
Trim Caulk and Filler MaterialsLabor on: Trim Paint Apply Labor36lf$0$8$8
Trim Paint Apply Labor70lf1 to 4 h$157$0$157
Painting subtotal12 to 17 h$1,340
Painting subtotal12 to 17 h$1,340
Vanity & Fixtures
Cabinet Install Fasteners and ShimsLabor on: Custom Built-In Carpentry6lf$0$17$17
Vanity & Fixtures subtotal$17
Vanity & Fixtures subtotal$17
Exterior
Exterior Caulking and Sealing Labor28lfunder 1 h$49$0$49
House Wrap Install Labor214.66sf1 to 3 h$82$0$82
House Wrap MaterialsLabor on: House Wrap Install Labor236.13sf$0$99$99
Soffit and Fascia MaterialsLabor on: Soffit and Fascia Install27lf$0$229$229
Vinyl Siding Install Labor214.66sf3 to 7 h$451$0$451
Vinyl Siding MaterialsLabor on: Vinyl Siding Install Labor236.13sf$0$732$732
Exterior subtotal5 to 10 h$1,642
Exterior subtotal5 to 10 h$1,642
Roofing
Asphalt Shingle Install Labor0.92square1 to 2 h$175$0$175
Asphalt Shingle MaterialsLabor on: Asphalt Shingle Install Labor1.01square$0$177$177
Downspout Install Labor2ea1 to 3 h$150$0$150
Downspout MaterialsLabor on: Downspout Install Labor2ea$0$110$110
Drip Edge MaterialsLabor on: Asphalt Shingle Install Labor40.28lf$0$38$38
Gutter Install Labor18lf1 to 2 h$99$0$99
Gutter MaterialsLabor on: Gutter Install Labor19.8lf$0$109$109
Ice Water Shield Install Labor0.14squnder 1 h$6$0$6
Ice Water Shield MaterialsLabor on: Ice Water Shield Install Labor0.14sq$0$13$13
Magnetic Nail Sweep Labor1ea1 to 3 h$140$0$140
Ridge Vent Install Labor11.51lfunder 1 h$29$0$29
Ridge Vent MaterialsLabor on: Ridge Vent Install Labor11.51lf$0$49$49
Step Flashing Install Labor11lfunder 1 h$38$0$38
Step Flashing MaterialsLabor on: Step Flashing Install Labor12.1lf$0$21$21
Synthetic Underlayment Install Labor0.92squareunder 1 h$28$0$28
Synthetic Underlayment Materials0.97square$0$15$15
Roofing subtotal6 to 9 h$1,197
Roofing subtotal6 to 9 h$1,197
Landscaping
Site Grading Labor215sfunder 1 h$60$0$60
Sod Install Labor215sf1 to 4 h$118$0$118
Sod MaterialsLabor on: Sod Install Labor225.75sf$0$192$192
Landscaping subtotal1 to 4 h$370
Landscaping subtotal1 to 4 h$370
DIRECT JOB COST253 to 307 h$35,588
DIRECT JOB COST253 to 307 h$35,588

Methodology & reproducibility

One reviewed snapshot for this build. The build is frozen from its own estimate run and priced by the published pricer.

Direct cost equals the sum of each row’s rounded quantity × (labor + material + other). Amounts are shown in whole dollars; every column adds to its total.

Scope selection, prose accuracy, arithmetic and provenance mapping reviewed; not independent market-rate verification.

Questions

What drives the cost of a small addition?

The foundation, the shell and the trades show up at almost any size: excavation, footings, framing, roofing tied into the house, siding, insulation, electrical, HVAC, drywall and paint. At 80 sf they spread over few feet, which is why small additions cost more per square foot than houses.

What does this leave out?

Permit fees, structural surprises beyond the engineering review allowance, and any plumbing. The markup table shows illustrative selling prices; direct job cost is not a price.

What would a bathroom in the addition add?

This build has none. A bath adds rough plumbing, fixtures, tile and ventilation; describe one in the estimator to price it for your job.