Maine Lien Notice to the Homeowner (2026): None Required From the Prime Contractor

What a contractor hired directly by a homeowner must give the owner in Maine to keep lien rights, when it is due, and a $32,000 kitchen answered.

Short answer: A contractor with a contract with the owner gives no preliminary notice. Its lien is kept by filing an enforcement action within 120 days after the last labor or services. On a $32,000 kitchen signed March 2 with work starting March 16: Nothing was due by March 16; Maine has no prime notice to the owner.

Not legal advice. General information from each state's mechanics lien statute, checked Nov 25, 2026. It covers a contractor hired directly by the owner-occupant of an existing single-family home. Subs and suppliers have different notice duties, and later steps (recording the lien, suing on it) have their own deadlines. Ask a construction lawyer in your state before you rely on a lien.

The rule in Maine

Rule

No notice

A contractor with a contract with the owner gives no preliminary notice. Its lien is kept by filing an enforcement action within 120 days after the last labor or services.

Notice to the homeowner due

None for the prime

Source

10 M.R.S. 3255; 10 M.R.S. 1487

legislature.maine.gov (official), data extracted October 5, 2026. 3255 and 1487 both read.

“within 120 days after the last of the labor or services are performed”

A $32,000 kitchen in Maine

A remodeler signs a $32,000 kitchen contract with the owner-occupant of a single-family home on March 2 and starts work on March 16. Did the remodeler have to give the owner anything by the time work started to keep its own lien rights?

Had to act by the time work started?

No

Nothing was due by March 16; Maine has no prime notice to the owner.

The details

Deadline

None before or during work; lien action within 120 days after last work.

If you miss it

Nothing is lost for lack of an early notice (10 M.R.S. 3255).

Subs and suppliers

Those without a contract with the owner can enforce only up to the balance the owner still owes the contractor when the owner is served or gets their written notice, which must carry the statutory 'paying twice' warning; this cap applies where the owner resides on the premises.

Maine lien notice questions

Does a contractor have to send a preliminary notice to the homeowner in Maine?

A contractor with a contract with the owner gives no preliminary notice. Its lien is kept by filing an enforcement action within 120 days after the last labor or services.

What happens if a contractor misses the notice in Maine?

Nothing is lost for lack of an early notice (10 M.R.S. 3255).

Do subs and suppliers have to give notice in Maine?

Those without a contract with the owner can enforce only up to the balance the owner still owes the contractor when the owner is served or gets their written notice, which must carry the statutory 'paying twice' warning; this cap applies where the owner resides on the premises.

Compare other states

More Maine rules for contractors

How we checked

We read each state's mechanics lien statute and contractor board rules for what a contractor hired directly by a homeowner must give the owner at signing, before work, before payment or shortly after starting. Two independent research passes covered all 50 states and DC. Where a state's own site would not load, the row names the copy we read. A state stays "still being checked" until its current section has been read. Last checked .

This guide explains the general rule. It is not legal advice.