Lien notice · New Jersey

New Jersey Lien Notice to the Homeowner (2026): None Required From the Prime Contractor

What a contractor hired directly by a homeowner must give the owner in New Jersey to keep lien rights, when it is due, and a $32,000 kitchen answered.

Short answer: No notice is due at signing or before work. To lien a home, the contractor must first lodge a Notice of Unpaid Balance and Right to File Lien with the county clerk within 60 days after last furnishing, serve it, and demand arbitration within 10 days of lodging. On a $32,000 kitchen signed March 2 with work starting March 16: Nothing was due by March 16; the clock starts on the last day of work.

Not legal advice. General information from each state's mechanics lien statute, checked Nov 25, 2026. It covers a contractor hired directly by the owner-occupant of an existing single-family home. Subs and suppliers have different notice duties, and later steps (recording the lien, suing on it) have their own deadlines. Ask a construction lawyer in your state before you rely on a lien.

The rule in New Jersey

Rule

No notice

No notice is due at signing or before work. To lien a home, the contractor must first lodge a Notice of Unpaid Balance and Right to File Lien with the county clerk within 60 days after last furnishing, serve it, and demand arbitration within 10 days of lodging.

Notice to the homeowner due

None before work

Lodged for record with the county clerk, then served on the owner under the lien claim service rules.

Source

N.J.S.A. 2A:44A-20, 2A:44A-21(b)

Justia mirror, 2023 New Jersey Revised Statutes (the legislature's statute gateway does not load in this tool). History: L.1993, c.318, s.21; amended 2010, c.119, s.15.

“condition precedent to the filing of any lien arising under a residential construction contract”

A $32,000 kitchen in New Jersey

A remodeler signs a $32,000 kitchen contract with the owner-occupant of a single-family home on March 2 and starts work on March 16. Did the remodeler have to give the owner anything by the time work started to keep its own lien rights?

Had to act by the time work started?

No

Nothing was due by March 16; the clock starts on the last day of work.

The details

Deadline

Within 60 days after the last date work, services, material or equipment was provided; arbitration demand within 10 days after lodging.

Required form

Statutory form in N.J.S.A. 2A:44A-20.

If you miss it

No lien on a residential construction contract without the lodged notice and the arbitration step (2A:44A-21(b)).

Subs and suppliers

Subs and suppliers follow the same Notice of Unpaid Balance and arbitration steps; there is no separate start-of-job notice.

New Jersey lien notice questions

Does a contractor have to send a preliminary notice to the homeowner in New Jersey?

No notice is due at signing or before work. To lien a home, the contractor must first lodge a Notice of Unpaid Balance and Right to File Lien with the county clerk within 60 days after last furnishing, serve it, and demand arbitration within 10 days of lodging.

What happens if a contractor misses the notice in New Jersey?

No lien on a residential construction contract without the lodged notice and the arbitration step (2A:44A-21(b)).

Do subs and suppliers have to give notice in New Jersey?

Subs and suppliers follow the same Notice of Unpaid Balance and arbitration steps; there is no separate start-of-job notice.

Compare other states

More New Jersey rules for contractors

How we checked

We read each state's mechanics lien statute and contractor board rules for what a contractor hired directly by a homeowner must give the owner at signing, before work, before payment or shortly after starting. Two independent research passes covered all 50 states and DC. Where a state's own site would not load, the row names the copy we read. A state stays "still being checked" until its current section has been read. Last checked .

This guide explains the general rule. It is not legal advice.