Nevada Lien Notice to the Homeowner (2026): Due Before Signing, Lien Kept if Missed
What a contractor hired directly by a homeowner must give the owner in Nevada to keep lien rights, when it is due, and a $32,000 kitchen answered.
Not legal advice. General information from each state's mechanics lien statute, checked Nov 25, 2026. It covers a contractor hired directly by the owner-occupant of an existing single-family home. Subs and suppliers have different notice duties, and later steps (recording the lien, suing on it) have their own deadlines. Ask a construction lawyer in your state before you rely on a lien.
The rule in Nevada
Disclosure
Before the contract is signed, tell the owner about Nevada's notice of right to lien rules using the statutory form, and give each sub on the job a copy. Missing it is a licensing matter, not a lien bar. A general building contractor on a single-family residence must also give the owner a written list of its subcontractors and suppliers and a notice that they may record a lien (NRS 624.600).
Before signing
Not specified; the statute requires the prime to inform the owner and to deliver a copy to each subcontractor.
NRS 108.245(5), 108.245(6), 108.246(1)-(3), 108.226(6); NRS 624.600, 624.3016(6)
Nevada Legislature NRS chapter 108 page, revision stamp 4/15/2026 (2025 edition).
“is a ground for disciplinary proceedings under chapter 624 of NRS”
A $32,000 kitchen in Nevada
A remodeler signs a $32,000 kitchen contract with the owner-occupant of a single-family home on March 2 and starts work on March 16. Did the remodeler have to give the owner anything by the time work started to keep its own lien rights?
No
The 108.246 disclosure was due before signing on March 2, but missing it does not cost the lien.
The details
Deadline
Before execution of the construction contract.
Required form
Substantially the form set out in NRS 108.246.
If you miss it
Discipline under NRS chapter 624 (NRS 108.246(3)). The section says nothing about losing the lien. The prime is exempt from the notice of right to lien under NRS 108.245(5). Failing NRS 624.600 is also a ground for discipline (NRS 624.3016(6)), not a lien bar.
Subs and suppliers
Subs and suppliers (other than labor only) must deliver a notice of right to lien to the owner in person or by certified mail, with a copy to the prime; it reaches back 31 days.
Nevada lien notice questions
Does a contractor have to send a preliminary notice to the homeowner in Nevada?
Before the contract is signed, tell the owner about Nevada's notice of right to lien rules using the statutory form, and give each sub on the job a copy. Missing it is a licensing matter, not a lien bar. A general building contractor on a single-family residence must also give the owner a written list of its subcontractors and suppliers and a notice that they may record a lien (NRS 624.600).
What happens if a contractor misses the notice in Nevada?
Discipline under NRS chapter 624 (NRS 108.246(3)). The section says nothing about losing the lien. The prime is exempt from the notice of right to lien under NRS 108.245(5). Failing NRS 624.600 is also a ground for discipline (NRS 624.3016(6)), not a lien bar.
Do subs and suppliers have to give notice in Nevada?
Subs and suppliers (other than labor only) must deliver a notice of right to lien to the owner in person or by certified mail, with a copy to the prime; it reaches back 31 days.
Compare other states
More Nevada rules for contractors
How we checked
We read each state's mechanics lien statute and contractor board rules for what a contractor hired directly by a homeowner must give the owner at signing, before work, before payment or shortly after starting. Two independent research passes covered all 50 states and DC. Where a state's own site would not load, the row names the copy we read. A state stays "still being checked" until its current section has been read. Last checked .
This guide explains the general rule. It is not legal advice.