Oregon Lien Notice to the Homeowner (2026): Due at Signing

What a contractor hired directly by a homeowner must give the owner in Oregon to keep lien rights, when it is due, and a $32,000 kitchen answered.

Short answer: On a residential contract over $2,000, deliver the Construction Contractors Board's Information Notice to Owner About Construction Liens when the contract is signed. Without it the contractor cannot claim a lien on that contract. On a $32,000 kitchen signed March 2 with work starting March 16: The Information Notice to Owner was due at signing on March 2.

Not legal advice. General information from each state's mechanics lien statute, checked Nov 25, 2026. It covers a contractor hired directly by the owner-occupant of an existing single-family home. Subs and suppliers have different notice duties, and later steps (recording the lien, suing on it) have their own deadlines. Ask a construction lawyer in your state before you rely on a lien.

The rule in Oregon

Rule

Lien at stake

On a residential contract over $2,000, deliver the Construction Contractors Board's Information Notice to Owner About Construction Liens when the contract is signed. Without it the contractor cannot claim a lien on that contract.

Notice to the homeowner due

At signing

Personal delivery, registered or certified mail, or first class mail with certificate of mailing.

Source

ORS 87.093(2)(b), (3), (4), (5), (6)

oregon.public.law mirror (2023 edition with 2024 session changes, page says current through early 2026); the form itself read on the Construction Contractors Board site (oregon.gov/ccb). The legislature's ors087.html would not load in this tool.

“the original contractor may not claim any lien created under”

A $32,000 kitchen in Oregon

A remodeler signs a $32,000 kitchen contract with the owner-occupant of a single-family home on March 2 and starts work on March 16. Did the remodeler have to give the owner anything by the time work started to keep its own lien rights?

Had to act by the time work started?

Yes

The Information Notice to Owner was due at signing on March 2.

The details

Deadline

At the time of signing the residential construction or improvement contract; if the price starts under $2,000, within five days after the contractor knows or should know it will exceed $2,000.

Required form

The form adopted by the board, with signature lines for the contractor and the owner.

If you miss it

Whole lien lost for that contract (ORS 87.093(6)); the board may also suspend the contractor's license (87.093(7)).

Subs and suppliers

Subs and suppliers who do not deal with the owner give their own notice of right to a lien under ORS 87.021, which protects work from eight days before the notice.

Oregon lien notice questions

Does a contractor have to send a preliminary notice to the homeowner in Oregon?

On a residential contract over $2,000, deliver the Construction Contractors Board's Information Notice to Owner About Construction Liens when the contract is signed. Without it the contractor cannot claim a lien on that contract.

What happens if a contractor misses the notice in Oregon?

Whole lien lost for that contract (ORS 87.093(6)); the board may also suspend the contractor's license (87.093(7)).

Do subs and suppliers have to give notice in Oregon?

Subs and suppliers who do not deal with the owner give their own notice of right to a lien under ORS 87.021, which protects work from eight days before the notice.

Compare other states

More Oregon rules for contractors

How we checked

We read each state's mechanics lien statute and contractor board rules for what a contractor hired directly by a homeowner must give the owner at signing, before work, before payment or shortly after starting. Two independent research passes covered all 50 states and DC. Where a state's own site would not load, the row names the copy we read. A state stays "still being checked" until its current section has been read. Last checked .

This guide explains the general rule. It is not legal advice.

Related