West Virginia Lien Notice to the Homeowner (2026): None Required From the Prime Contractor
What a contractor hired directly by a homeowner must give the owner in West Virginia to keep lien rights, when it is due, and a $32,000 kitchen answered.
Not legal advice. General information from each state's mechanics lien statute, checked Nov 25, 2026. It covers a contractor hired directly by the owner-occupant of an existing single-family home. Subs and suppliers have different notice duties, and later steps (recording the lien, suing on it) have their own deadlines. Ask a construction lawyer in your state before you rely on a lien.
The rule in West Virginia
No notice
No notice is due at signing or at the start of work. The general contractor perfects the lien by recording a notice of lien within 100 days after completing the contract.
None for the prime
Recorded with the clerk of the county commission where the property is.
W. Va. Code 38-2-1, 38-2-7, 38-2-8, 38-2-14, 38-2-20, 38-2-21(b), 38-2-34(b)
West Virginia Legislature code site, Article 38-2 PDF dated June 12, 2026.
“within one hundred days after the completion of his work”
A $32,000 kitchen in West Virginia
A remodeler signs a $32,000 kitchen contract with the owner-occupant of a single-family home on March 2 and starts work on March 16. Did the remodeler have to give the owner anything by the time work started to keep its own lien rights?
No
Nothing was due by March 16; the 100 days run from completion.
The details
Deadline
Within 100 days after completion of the work under the contract.
Required form
Sufficient if in the form set out in W. Va. Code 38-2-8, sworn.
If you miss it
Lien discharged if not recorded in time (38-2-7, 38-2-14). Nothing is lost at the start of the job.
Subs and suppliers
Subs and suppliers serve the owner and record their notice of lien within 100 days; on an existing or owner-occupied single-family dwelling the owner can defend by showing it owes the contractor nothing or less than the lien.
West Virginia lien notice questions
Does a contractor have to send a preliminary notice to the homeowner in West Virginia?
No notice is due at signing or at the start of work. The general contractor perfects the lien by recording a notice of lien within 100 days after completing the contract.
What happens if a contractor misses the notice in West Virginia?
Lien discharged if not recorded in time (38-2-7, 38-2-14). Nothing is lost at the start of the job.
Do subs and suppliers have to give notice in West Virginia?
Subs and suppliers serve the owner and record their notice of lien within 100 days; on an existing or owner-occupied single-family dwelling the owner can defend by showing it owes the contractor nothing or less than the lien.
Compare other states
More West Virginia rules for contractors
How we checked
We read each state's mechanics lien statute and contractor board rules for what a contractor hired directly by a homeowner must give the owner at signing, before work, before payment or shortly after starting. Two independent research passes covered all 50 states and DC. Where a state's own site would not load, the row names the copy we read. A state stays "still being checked" until its current section has been read. Last checked .
This guide explains the general rule. It is not legal advice.