Washington Lien Notice to the Homeowner (2026): Due Before Work Starts
What a contractor hired directly by a homeowner must give the owner in Washington to keep lien rights, when it is due, and a $32,000 kitchen answered.
Not legal advice. General information from each state's mechanics lien statute, checked Nov 25, 2026. It covers a contractor hired directly by the owner-occupant of an existing single-family home. Subs and suppliers have different notice duties, and later steps (recording the lien, suing on it) have their own deadlines. Ask a construction lawyer in your state before you rely on a lien.
The rule in Washington
Lien at stake
On a residential job of $1,000 or more, give the customer the statutory Notice to Customer disclosure before starting work, get it signed, and keep the signed copy three years. A lien claim fails unless the contractor pleads and proves it was given.
Before work starts
Provided to the customer; the form ends with the customer's signature line and the contractor must retain a signed copy.
RCW 18.27.114(1), (2), (4), (5); RCW 60.04.031(2)(a), (3)
Washington Legislature law files (lawfilesext.leg.wa.gov): RCW 18.27.114, history ending 2020 c 57 s 26; RCW 60.04.031 PDF certified 7/12/2024, history 1992 c 126 s 2.
“prior to starting work on the project”
A $32,000 kitchen in Washington
A remodeler signs a $32,000 kitchen contract with the owner-occupant of a single-family home on March 2 and starts work on March 16. Did the remodeler have to give the owner anything by the time work started to keep its own lien rights?
Yes
The Notice to Customer had to be given before work started on March 16.
The details
Deadline
Prior to starting work on the project.
Required form
Substantially the statutory NOTICE TO CUSTOMER, lower case and upper case twelve-point type with bold where appropriate.
If you miss it
No lien claim under chapter 60.04 RCW on that contract without alleging and proving the disclosure was provided (RCW 18.27.114(4)).
Subs and suppliers
Subs and suppliers who do not contract with the owner must give the owner a notice of right to claim a lien; on an existing owner-occupied home their lien reaches only amounts the owner has not yet paid the prime when the notice is received.
Washington lien notice questions
Does a contractor have to send a preliminary notice to the homeowner in Washington?
On a residential job of $1,000 or more, give the customer the statutory Notice to Customer disclosure before starting work, get it signed, and keep the signed copy three years. A lien claim fails unless the contractor pleads and proves it was given.
What happens if a contractor misses the notice in Washington?
No lien claim under chapter 60.04 RCW on that contract without alleging and proving the disclosure was provided (RCW 18.27.114(4)).
Do subs and suppliers have to give notice in Washington?
Subs and suppliers who do not contract with the owner must give the owner a notice of right to claim a lien; on an existing owner-occupied home their lien reaches only amounts the owner has not yet paid the prime when the notice is received.
Compare other states
More Washington rules for contractors
How we checked
We read each state's mechanics lien statute and contractor board rules for what a contractor hired directly by a homeowner must give the owner at signing, before work, before payment or shortly after starting. Two independent research passes covered all 50 states and DC. Where a state's own site would not load, the row names the copy we read. A state stays "still being checked" until its current section has been read. Last checked .
This guide explains the general rule. It is not legal advice.