Texas Lien Notice to the Homeowner (2026): Due Before Work Starts
What a contractor hired directly by a homeowner must give the owner in Texas to keep lien rights, when it is due, and a $32,000 kitchen answered.
Not legal advice. General information from each state's mechanics lien statute, checked Nov 25, 2026. It covers a contractor hired directly by the owner-occupant of an existing single-family home. Subs and suppliers have different notice duties, and later steps (recording the lien, suing on it) have their own deadlines. Ask a construction lawyer in your state before you rely on a lien.
The rule in Texas
Lien at stake
On a homestead, the lien needs a written contract signed before any labor or material, signed by both spouses if the owner is married, and filed with the county clerk. Separately, give the statutory disclosure statement before the owner signs; leaving that out does not void the lien.
Before work starts
Written contract signed by the owner (and spouse) and filed with the county clerk of the county where the homestead is; disclosure statement delivered to the owner.
Tex. Prop. Code 53.254(a)-(g), 53.255(a)-(c)
FindLaw, current as of January 1, 2026, for 53.254 and 53.255; texas.public.law (verified against the official site May 26, 2025) agrees. Enrolled SB 929 read on capitol.texas.gov. The official chapter 53 page does not load in this tool.
“The contract must be executed before the material is furnished”
A $32,000 kitchen in Texas
A remodeler signs a $32,000 kitchen contract with the owner-occupant of a single-family home on March 2 and starts work on March 16. Did the remodeler have to give the owner anything by the time work started to keep its own lien rights?
Yes
The written contract had to be signed by the owner and spouse before work started March 16; the disclosure was due before signing on March 2.
The details
Deadline
Homestead contract: executed before material is furnished or labor performed. Disclosure statement: before the owner executes the residential construction contract.
Required form
Disclosure must read substantially like Property Code 53.255(b), beginning "KNOW YOUR RIGHTS AND RESPONSIBILITIES UNDER THE LAW."
If you miss it
No lien on the homestead without the 53.254 contract steps. Omitting the 53.255 disclosure does not invalidate a lien (53.255(c)).
Subs and suppliers
The prime's homestead contract inures to the benefit of subs and suppliers, who must still send their own notices under Subchapter C with the homestead statement attached.
Recent change
SB 929 (89th Legislature, 2025) amended only Property Code 53.003(e) and 53.124(e). A chapter 53 deadline that ends on a Saturday, Sunday or legal holiday now runs to the next business day, and a cross-reference in 53.124(e) was corrected. In force no later than September 1, 2025. It did not change 53.254 or 53.255, which were last amended by HB 2237 effective January 1, 2022.
Texas lien notice questions
Does a contractor have to send a preliminary notice to the homeowner in Texas?
On a homestead, the lien needs a written contract signed before any labor or material, signed by both spouses if the owner is married, and filed with the county clerk. Separately, give the statutory disclosure statement before the owner signs; leaving that out does not void the lien.
What happens if a contractor misses the notice in Texas?
No lien on the homestead without the 53.254 contract steps. Omitting the 53.255 disclosure does not invalidate a lien (53.255(c)).
Do subs and suppliers have to give notice in Texas?
The prime's homestead contract inures to the benefit of subs and suppliers, who must still send their own notices under Subchapter C with the homestead statement attached.
Compare other states
More Texas rules for contractors
How we checked
We read each state's mechanics lien statute and contractor board rules for what a contractor hired directly by a homeowner must give the owner at signing, before work, before payment or shortly after starting. Two independent research passes covered all 50 states and DC. Where a state's own site would not load, the row names the copy we read. A state stays "still being checked" until its current section has been read. Last checked .
This guide explains the general rule. It is not legal advice.